Recent content by lrh442

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. lrh442

    Siemens Caltrans/IDOT Venture design, engineering, testing and delivery (2Q 2024)

    Automatic Train Stop (ATS) has been in use for nearly a century and has proven to be a reliable system. The pickup shoe is mounted on the outboard side of the loco truck and is positioned to pass within 1.5" of the stationary shoe mounted trackside (per Wiki). Hopefully the shunt antenna will...
  2. lrh442

    History of the creation of Railpax which became Amtrak

    I, too, get an error message when trying to download the "273 page 3-ring binder" from McKinsey.
  3. lrh442

    Southwest Chief discussion Q4 2023 - 2024

    Well, that's a raw deal. You have my sympathies. FWIW, I believe there are no Amtrak employees at the Jeff City station. Sounds like maybe you got bad info from a volunteer who was staffing the station?
  4. lrh442

    History of the creation of Railpax which became Amtrak

    Here are links to Part 2 and Part 3: Amtrak at 50: Defining the "Basic System" of Service Routes - The Eno Center for Transportation (enotrans.org) Amtrak at 50: How McKinsey Designed A National Railroad - The Eno Center for Transportation (enotrans.org)
  5. lrh442

    Long Distance (LD) fleet replacement RFP discussion 2024 H1

    A few things on the roomettes that previously escaped my notice but are now clear, thanks to turtlypo: - Occupant of the upper berth can see out of the upper section of the window (Figure 11-69). - On the aisle side of the cabin there is only a single small(ish) window in the door. The wall...
  6. lrh442

    Dreamstar overnight train between San Francisco and Los Angeles?

    There may well be a market for this, but the real hurdles are obtaining equipment and negotiating reasonable trackage rights terms from UP. I don't see it happening anytime soon. And, if CAHSR is ever fully completed it will make an overnight train a moot issue.
  7. lrh442

    Long Distance (LD) fleet replacement RFP discussion 2024 H1

    Fascinating read! Thank you, Paniolo Man for making these available. I am struck be the incredible complexity of the specifications and wonder if Amtrak will find multiple bidders, and if the bids will be deemed affordable. The Superliner IIs cost about $2.3M each in 1991, which is $5.2M...
  8. lrh442

    40K points for FNBO Preferred Mastercard

    For a limited time FNBO is offering 40K AGR points when you sign up for the Preferred Mastercard, up from 20K points previously. To get the full 40K points you must spend $2K in the first 3 months. If points can be redeemed for approx. $0.027 each then the 40K points are worth $1,080, less...
  9. lrh442

    FRA Long Distance Service Study discussion

    Indeed. According to the presentation deck the earliest to start any service is 15 years out. Conceptual Timelines for Implementation (pg 154): Near Term: 2040 - 2050 Mid-Term 2050 - 2060 Long Term: 2060+ I'm still buying green bananas, but I'm not planning on being around to ride anything...
  10. lrh442

    Long Distance (LD) fleet replacement discussion (2022 - 2024Q1)

    Superliners are fluted, no? Edit: I guess they are a mix of fluted and flat panels.
  11. lrh442

    Long Distance (LD) fleet replacement discussion (2022 - 2024Q1)

    Are they painted for purely cosmetic reasons? Or perhaps the car shell is not entirely SS? Seems that polished SS would be lower maintenance than paint. I can't recall any smooth sided heritage/legacy equipment in polished SS, though. Maybe the smooth sided design doesn't hide imperfections...
  12. lrh442

    Tracking FY 2024 Ridership and Finances

    Tangled indeed. Doesn't Amtrak calculate break even using "above the rail costs", which means that the NEC is not charged (in break-even analysis) for anything to do with the track? Yet, LD route economics do get an accounting charge for the fee paid to the host railroad for use of the track...
  13. lrh442

    Tracking FY 2024 Ridership and Finances

    Trains News Wire did an analysis of how equipment shortages are strangling ridership on the LD trains. https://www.trains.com/trn/news-reviews/news-wire/a-closer-look-at-how-capacity-impacts-growth-on-amtraks-network-analysis/?_ga=2.204494163.27362900.1707329774-215885997.1707329773 A couple...
  14. lrh442

    Tracking FY 2024 Ridership and Finances

    Is there a landing page from which all of the monthly reports can be accessed? I've tried whittling down the URL to back into it, but without success.
  15. lrh442

    Can Private Railroads operate passenger service without government help?

    UP's revenue in 2022 was $24.8 Billion. In the same year, total revenue for the Coast Starlight (which is 84% on UPRR tracks) was $43M. UP's "share" of that revenue based on mileage would have been $36M. $36M is equivalent to 0.15% of UP's total revenue. It's barely even a rounding error...
Back
Top