  1. GDRRiley

    Long Distance (LD) fleet replacement RFP discussion H1 2024

    Electronic Variable Neutral Density is different and decently mature. At this point it is in quite a bit of camera equipment
  2. GDRRiley

    Long Distance (LD) fleet replacement RFP discussion H1 2024

    Stadler just build 10 cars for RM that feature elevators
  3. GDRRiley

    Siemens Caltrans/IDOT Venture design, engineering, testing and delivery (2012-1Q 2024)

    These are paint We will see how the F59phi get painted post rebuild I'm doubtful of that cafes would be 5+ years away and for the cost we could likely get 1-2 more sets of equipment which is far more important. Really we need 4-5 more to hold the state over on rolling stock until Caltrans and...
  4. GDRRiley

    Long Distance (LD) fleet replacement RFP discussion H1 2024

    If they shared it after a FOIA its now public
  5. GDRRiley

    Caltrain looking at Battery Electric MU for Gilroy Service

    Not really, we are seeing amtrak CA do a F59phi rebuild again of at least 13 units if not more And those won't quite meet T4 with renewable diesel
  6. GDRRiley

    Caltrain looking at Battery Electric MU for Gilroy Service

    They don't rule them out, CARB just won't fund them and they'll be limited to serving until 2035 if the current plan stands.
  7. GDRRiley

    San Clemente landslide affects Pacific Surfliner 1/24/24

    Yep its for commuters and to give them a 10 hour or so working window
  8. GDRRiley

    San Clemente landslide affects Pacific Surfliner 1/24/24

    https://octa.net/programs-projects/projects/rail-projects/track-protection-project-at-mariposa-point/ https://x.com/SenBlakespear/status/1765146418615050521?s=20 While we don't have an OCTA update the Senator has said service will return tomorrow Service pattern is weird
  9. GDRRiley

    VIA Rail Long Distance (LD) and Inter-Regional fleet replacement

    I wasn't saying bi level but doing a more wrap around window for coach, it seems like the kind of thing you'd need to use in a lounge or cafe/dinner
  10. GDRRiley

    Long Distance (LD) fleet replacement discussion (2022 - 2024Q1)

    the superliner II should have a decent amount of life left but the I are 10-20 years older That would leave 55 sleepers, 25 sightseers, 38 coaches, 30 dinners and 47 transition sleepers. in late 2021 nearly all those cars were active and not damaged What they'd have is some very sleeper heavy...
  11. GDRRiley

    VIA Rail Long Distance (LD) and Inter-Regional fleet replacement

    I suspect making all coaches that way would be a struggle as to have any attempt of darking out the train at night and storing luggage above means you'd need a weird setup
  12. GDRRiley

    VIA Rail Long Distance (LD) and Inter-Regional fleet replacement

    Yeah I assume it can fit plate F which would mean cutting a foot off the car.
  13. GDRRiley

    VIA Rail Long Distance (LD) and Inter-Regional fleet replacement

    Stadler could easily enough, they've done sleeper FLIRTS and coaches before as well as a few different window styles and a NA compatible design. The Bi levels they made for RM were built in Europe, I suspect their 18ft2in height and 89.75ft long length might present a minor issue. We don't know...
  14. GDRRiley

    VIA Rail Long Distance (LD) and Inter-Regional fleet replacement

    Because at this point there are so many orders for Siemens if you want their stuff its going to be a wait. And if you rush and order the cars before design is done you get the mistake Amtrak made with airo cafe cars which pushed the project back 6 months and cost nearly 50M.
  15. GDRRiley

    VIA Rail Long Distance (LD) and Inter-Regional fleet replacement

    I'll note for some of the latest rebuilds the cars are stripped down to the frame and heavily modified Like I'm not sure how much is even original
  16. GDRRiley

    VIA Rail Long Distance (LD) and Inter-Regional fleet replacement

    Yes if they don't insist on doing their own thing it should be possible to get more than enough cars by then. The new Stadler cars took 4 years from order to delivery.
  17. GDRRiley

    Brightline Trains West!

    ETCS is looking like it will be chosen by Canada, it is at least being used for GO. We will see it working for North American sized freights soon. The I-ETMS relying on GPS make it far worse with major shortcomings. Its a barley functional system that pretty often dies. Had we gone pulse code...
  18. GDRRiley

    All about PTC, I-ETMS and ACSES

    Got 2 old presentations on ACSES and ITCS along with info on brightline Flordia's PTC system
  19. GDRRiley

    FRA Long Distance Service Study discussion

    I would get mid 2030s because of rolling stock and needing congress to agree but 2040s, is amtrak really that short staffed that they'll finish connect US stuff and then move onto LD
  20. GDRRiley

    Long Distance (LD) fleet replacement discussion (2022 - 2024Q1)

    Amtrak is going to need to find a way to get more crews, Amtrak should be assuming 1-2 western LD sets a year will get badly damaged as thats been the trend for a long time. Siemens says cars are 5+ years out so unless someone else can spool up a whole production line faster I don't see us...