Search results

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. leemell

    New Van Nuys Platform

    The contractor has begun prep for the platform build and has done the rail moves.  Here are two videos of the rail work over last two years or so:  
  2. leemell

    New FRA Rules

    Ooooops!  Sorry, missed that.
  3. leemell

    New FRA Rules

    Excerpted from the Midwest High Speed Rail Association (https://www.midwesthsr.org/new-regulations-allow-stronger-lighter-safer-modern-trains?eType=EmailBlastContent&eId=3f131ba3-c21f-412b-add6-d49e7b699bcf):      ...
  4. leemell

    Brightline Trains Florida discussion

    Here is an article with a Las Vegas perspective on the Virgin/Brighine: https://www.reviewjournal.com/business/tourism/richard-branson-virgin-to-partner-with-brightline-high-speed-rail-1528571/
  5. leemell

    Brightline Trains Florida discussion

    It is probably good news for the XW line too.  New money.
  6. leemell

    Probably dumb question about placement of engine

    The run-thru tracks at LAUS (not LAUPT) are in engineering design and should start construction in about 18-24 months.
  7. leemell

    Amtrak should have an overnight LA-Bay Area train

    No, 2033 for the full Phase I.  2025 for Bakersfield to SF.
  8. leemell

    Flagstaff, AZ

    Can't speak for the rooms at the Weatherford, but ate at the restaurant while waiting for out train.  It was really good and very inexpensive.
  9. leemell

    Brightline Trains West!

    Anybody heard anything new on this project?
  10. leemell

    Brightline Trains West!

    Well, with a dedicated dual track ROW and brand new equipment, that should not be much of a problem.
  11. leemell

    Brightline Trains West!

    Not to mention that very little of it is private land.
  12. leemell

    Brightline Trains West!

    As I wrote before, the last info release was that property acquisition start in June of this year.
  13. leemell

    Brightline Trains West!

    With passenger loads to be about 15,800 a day at the start, that would be 39 Round Trips trains a day LV to Victorville, more than just a small number of trains. Brightline did say they expected to lay out somewhere around $3.5B. By your estimate that would be about $1.85B at most to "drop the...
  14. leemell

    Brightline Trains West!

    The majority of the XW ROW is on BLM property for which they already negotiated and have the signed rights to build the tracks on.
  15. leemell

    Brightline Trains West!

    The High Desert Corridor is an entirely new route and ROW. Land acquisition began in June. It is/will be owned by CalTrans.
  16. leemell

    Brightline Trains West!

    Not just tourists, gamblers and show goers and partiers (sp). I15 is very frequently jammed on Friday and Sunday nights.
  17. leemell

    Brightline Trains West!

    I don't know if they got it for cheap, but the EIR and FRA ROD required hundreds of millions of dollars to process and get through the process, that includes the preliminary engineering of the whole route and design.
  18. leemell

    Brightline Trains West!

    This is a complementary project. The High Desert Corridor just getting underway. It is an Interstate Highway with rail ROW built into it. It will terminate between Victorville and Palmdale. Palmdale is the current northern terminal of Metrolink. In the future, it will be a station for the...
  19. leemell

    Brightline Trains West!

    They all charge these days, and quite bit.
  20. leemell

    Brightline Trains West!

    CHSRA is not going down the Grapevine, but through Tehatchipi Pass and down to Palmdale, then mostly along State 14 and under the San Gabriels.
Back
Top