    Metrolink (Los Angeles) outage in December 2023

    After talking with a few contacts this seems to be the plan in yellow vs the normal in blue. Run onto Alameda Corridor, flip ends then run up the east bank till rejoining before Glendale
  2. GDRRiley

    Metrolink (Los Angeles) outage in December 2023

    Really interested to see this reroute on an official map because I'm not 100% sure how they plan to do this
  3. GDRRiley

    Long Distance (LD) fleet replacement discussion (2022 - 2024Q1)

    mix of amfleets and SPV2000 got sent down there, the amfleets were damaged enough amtrak would never clear them again for 125mph ops
  4. GDRRiley

    Los Angeles Metrolink steps up to mitigate the I-10 closing

    The legislation is already quite strict but enforcement is lacking.
  5. GDRRiley

    Los Angeles Metrolink steps up to mitigate the I-10 closing

    ridership on metro is up about 10%, we will probably need to wait till the end of the week to really see how much it changed The feds nor state DOT don't want compartmentalization because that makes fighting the fires more risky, they limit what can be stored Part of the issue is the company...
  6. GDRRiley

    Los Angeles Metrolink steps up to mitigate the I-10 closing

    caltrans is extremely quick at emergency rebuilding, there isn't anyone to learn from. the plan is 3-5 weeks
  7. GDRRiley

    Los Angeles Metrolink steps up to mitigate the I-10 closing

    I'm aware but there needs to be more capacity on the line, fixing the segments on I-10 will be a challenge but near term everything east of El Monte can be double tracked. It wasn't allowed according to a press report this afternoon, the original lease holder was subleasing without approval and...
  8. GDRRiley

    Los Angeles Metrolink steps up to mitigate the I-10 closing

    I wish they'd use this as an opportunity like on Antalope Valley line in the 90s to expand service and infrastructure even more. The La Verne double track was in final design last year so lets get the Vultures and start construction existing single track is blank existing double track is green...
  9. GDRRiley

    Siemens Caltrans/IDOT Venture design, engineering, testing and delivery (2012-1Q 2024)

    They've been in caltrans hands for 3 years now its amtraks fault
  10. GDRRiley

    Pioneer and three others coming back?

    If it ran Denver to Seattle Via the overland route it would take ~33-36 hours meaning 4 sets would be needed. Which means amtraks needs to put 5 cars into service for every car that makes up the train assuming Amtrak can hold to a 80% reliability. So 5 baggage cars, 5 transition sleepers, 5...
  11. GDRRiley

    Metrolink (Los Angeles) outage in December 2023

    I find it a bit odd they don't pair up AV an SB and run that as a service. They would need to run across the river which means in the throat of UP yard but that should still allow a few round trips a day. As for Surfliner why not setup a temporary platform at Keller yard
  12. GDRRiley

    Stadler Flirt Hydrogen MUs for Amtrak California

    Socal Edison and others want to do that as well. It just doesn't make sense to do in warmer places. CA doesn't need natural gas outside of industrial uses given our climate. I the cost of these units was 20M each, thats about 1.5 times what a DMU and about double what a EMU would cost Mass...
  13. GDRRiley

    Stadler Flirt Hydrogen MUs for Amtrak California

    There was one push by a few LA politicians who wanted to take Prop1A money for local projects even though legally they can't. The units will likely be tested network wide on all amtrak california intercity routes and likely some region trains as well because CalSTA and Caltrans really want these...
  14. GDRRiley

    Stadler Flirt Hydrogen MUs for Amtrak California

    No these will bee tested state wide, calsta and caltrans really want it to work so they don't have to wire up
  15. GDRRiley

    Stadler Flirt Hydrogen MUs for Amtrak California

    decarbonizing should not be our focus, it is far better to mode shift to diesel rail than to focus on making what service we run zero emissions. Most hydrogen is not zero carbon and is made from natural gas, the stuff that is made from water eats up 3x the amount of electricity as wires alone would.
  16. GDRRiley

    Stadler Flirt Hydrogen MUs for Amtrak California

    I just hope the hydrogen sucks and so in a few years when CalSTA and Caltrans grow a brain we can just remove the hydrogen power car and make them EMUs.
  17. GDRRiley

    Airo - Amfleet I replacement Siemens Inter City Trainsets (ICT) (2021 - 1Q 2024)

    I would expect they get tested to 125mph unless the state and midwest decided that isn't worth doing in which case they'll be tested for 110mph.
  18. GDRRiley

    Airo - Amfleet I replacement Siemens Inter City Trainsets (ICT) (2021 - 1Q 2024)

    you don't want the AC and all the lighting getting shutoff after every train stop.
  19. GDRRiley

    Brightline Trains Florida discussion 2023 Q4

    I read it as they ordered another 10 car so they are getting 30 more in total to make 10 7 car trains.
  20. GDRRiley

    Brightline Trains Florida discussion 2023 Q4

    80% is pretty common spare ratio for coaches but its normally pushing it for locos. But if you do preventative maintenance it can totally work.