    Siemens Caltrans/IDOT Venture design, engineering, testing and delivery (2012-1Q 2024)

    I saw 4 Venture Business Class cars parked at the Chicago Union Station mail platform a couple of weeks ago.
  2. N

    Amtrak concedes perpetual $1 Billion/Year operating losses

    It is important to remember that Amtrak routes fall into 3 categories. They have chosen to focus on the loss on long distance because that's the part they have to pay for. In normal times NEC breaks even on an operating basis (i.e. not including capital costs due to the extremely high fares...
  3. N

    Rail stations at Airports

    An interesting tidbit about ATL water table. Apparently, there is an engineering solution.
  4. N

    Rail stations at Airports

    Eventually, the Charlotte-Atlanta high-speed rail line, which has an approved Tier 1 EIS, will be built. It should have stops in tunnels under the terminals at both CLT and ATL airports.
  5. N

    Airo - Amfleet I replacement Siemens Inter City Trainsets (ICT) (2021 - 1Q 2024)

    Does anyone know what the clearance is in the First Street tunnel?
  6. N

    Airo - Amfleet I replacement Siemens Inter City Trainsets (ICT) (2021 - 1Q 2024)

    It would be really good to electrify the First Street tunnel, just south of Washington Union Station, to resolve the smoke problem.
  7. N

    Lawmakers want Amtrak line from Atlanta to Nashville

    The FRA SE and Midwest Regional Plans are quite interesting. They propose Atlanta being a stop on a Florida to Chicago high-speed which would attract enough riders for hourly service. Atlanta should have both an Airport and a downtown station, as well as one in Cobb County, all on dedicated...
  8. N

    North East Corridor (NEC) speeds, new stations and state of repair

    I think that this is a great idea. It would not require a lot of new right-of-way. The basis would be a pretty direct route between Hartford and Worcester using the alignment of a short line from Hartford and Manchester, I-84 to Sturbridge, MA, the Mass Pike to Auburn, and CSX to Worcester Union...
  9. N

    Improving Amtrak Reservation system

    I have recently made my first two Amtrak reservations in about 6 months. I was totally unsuccessful using the website. In both cases I had to call. Those worked fine. One required an hour wait. Seems to be some kind of glitch on the website.
  10. N

    The North South Connect

    An important thing to keep in mind is that bi-mode trains, able to operate with or without wires, are now becoming regular production items. Note the recent Amtrak order for a large number of regional trains.
  11. N

    Airo - Amfleet I replacement Siemens Inter City Trainsets (ICT) (2021 - 1Q 2024)

    I had forgotten that MN and LIRR had ordered Chargers adapted for third rail. I wonder why Amtrak didn't order some more of those for Empire Service. Maybe they and/or Siemens were looking for an excuse to test battery power. I haven't seen a rendering of a Siemens battery car yet.
  12. N

    Airo - Amfleet I replacement Siemens Inter City Trainsets (ICT) (2021 - 1Q 2024)

    It's very interesting that it appears that the way that the trainsets are being made "dual mode" is to put the "elictric stuff" (AC transformer, pantograph, and other switchgear) in the end of the business class car next to the diesel which, thus, could be a pretty plain vanilla Charger...
  13. N

    March 2022 Greyhound cuts

    A few points to note: - Flixbus bought Greyhound a few months ago, for a bargain price. They have chosen to keep the brands separate. - While there's no Ambus, many states are subsidizing intercity bus routes using Federal FTA-funding, including some of Greyhound's. Most try to stay in the...
  14. N

    High Speed Rail Across New Mexico Proposed

    The distance is not much different; there might not be a noticeable time penalty and it could add a lot of riders.
  15. N

    High Speed Rail Across New Mexico Proposed

    Also, people should be aware that FRA completed a SW Regional Rail Plan a few years ago which included the concept of a conventional (not HS) Denver-Pueblo-Santa Fe-Albuquerque-Flagstaff-Williams Jct. (Grand Canyon)-Phoenix route with multiple daily frequencies. SW Study Summary Report | FRA
  16. N

    High Speed Rail Across New Mexico Proposed

    Has anyone ever looked into re-routing the SW Chief via Santa Fe? Presumably, this would involve upgrading the short line to/from Lamy. A turning loop might also be required to allow the train to go into Santa Fe itself.
  17. N

    Brightline Trains Florida discussion

    I don't why everyone assumes that commuter rail in the coastal corridor will use equipment with doors requiring low level platforms. Commuter service would benefit from high level platforms, as in NEC. It would also save building separate platforms. Does Brightline not want to share their stations?
  18. N

    Gardner reiterates corridor focus

    Yes, this is why there are no routes longer than 500 miles in the ConnectUS plan. A major advantage of true high speed rail is that, as long as they are implemented on major routes, they typically operate at a profit, avoiding the need for either the states or Feds from having to paying...
  19. N

    CSX to discontinue cab signals on RF&P and use I-ETMS instead

    Presumably, Virginia would not have agreed to this unless they were sure that the FRA would authorize the use of PTC for the 90 mph operation on the RF&P that they plan. I am still hoping that after FRA approves PTC for 110 with grade crossings on Brightline this can be applied to Chicago-St Louis.
  20. N

    Group working on Cascadia HSR

    I've been reading the exchange in this thread and feel that there are a few important points that the discussion has missed: Significant investment in HSR is only just justified in corridors with significant demand: Outside the NEC studies have identified these as 4 lines radiating out of...