J
JBnWaverly
Guest
Just completed short (lol) Den- GSC via non-berth roomette. Out on 01/20. Return next day 01/21. First the bad, CZ one hour late arrival in Denver, no worries. Then an abrupt stop in Gore Canyon around 2PM due to a rock between the rails which flat-spotted some of drive wheels in the ensuing emergency application. Another hour plus delay to formulate a plan. Next was a 12 mile crawl to closest siding to set out the power and borrow one from a waiting #6 at Radium, now four plus hours behind. Engine swap completed and were ready to go, but crew wasn't. Dead on hours, and apparently someone failed to realize how long crew was on duty, so we then waited hour plus for relief crew from GJT. Obviously some serious bad luck with the rock slide to make it through detector fence without alert, and to happen after track inspector, but before we our passing. Worse part of experience was I had my twin grandsons on their first rail trip after months of negotiations with mom. Let me share that my first contact in over eight hours with a frantic mother was tough. We originally intended to detrain and spend night in Grand Junction, but at 11PM and 15 hours with two completely worn out 4 year olds, I bailed at GSC. Thankful that no one was injured, and conductor worked his best to balance mechanical issues with the fate of 200 some passengers. Good part... return was uneventful (though #6 arrival was 60 minutes late to Glenwood), and we enjoyed the spectacular trip dropping from Moffat into Denver. The worse of my damage is most likely the end of train travel with the grandkids. JB