Acela150
Super Buff
On Saturday ALTO Tower closed. It is truly the end of an era as it was the last manned tower on the Pittsburgh Line. The PRR signals are now replaced, and the interlocking changed and handed over to NS CETC. The signal bridges have been dismantled as well. The interlocking is now CP Altoona.
If you have a Facebook page, Altoona Works fan page covered most of the days happenings. From MOW arriving, The Last train through ALTO, The block operator leaving the tower and crossing the tracks with his head down in sadness, The first train through the new interlocking, up to the signals being shown dismantled.
PRR sadly dies everyday a little bit more.
There is a silver lining to the towers exsitance. It will be dismantled, and moved to Strasburg.
Steve
If you have a Facebook page, Altoona Works fan page covered most of the days happenings. From MOW arriving, The Last train through ALTO, The block operator leaving the tower and crossing the tracks with his head down in sadness, The first train through the new interlocking, up to the signals being shown dismantled.
PRR sadly dies everyday a little bit more.
There is a silver lining to the towers exsitance. It will be dismantled, and moved to Strasburg.
Steve