So to do a loop trip to Vermont via the future Ethan Allen Express and the current Vermonter, you'd have to transfer somehow from one station to the other?Vermonter does not go through Burlington at all. It goes through Essex Jct.
jb
So to do a loop trip to Vermont via the future Ethan Allen Express and the current Vermonter, you'd have to transfer somehow from one station to the other?Vermonter does not go through Burlington at all. It goes through Essex Jct.
Uber/Lyft or possibly local transit. In any case you have to overnight in the Burlington/Essex Jct. area, so there really is not direct transfer from one train to the other.So to do a loop trip to Vermont via the future Ethan Allen Express and the current Vermonter, you'd have to transfer somehow from one station to the other?
jb
I suspect it is an ROI and operating cost issue perhaps.Does anybody have any insight as to why the Ethan Allen extension plan didn't connect the train lines after coming all the way up from Rutland?
jb
There is a local bus that runs between downtown Burlington & Essex Jct., except for the Sunday northbound train. Strangely, I can't find any fare info on the website.Uber/Lyft or possibly local transit. In any case you have to overnight in the Burlington/Essex Jct. area, so there really is not direct transfer from one train to the other.
There are cheaper hotel options outside of downtown, but everything is fairly expensive in the summer.
There is a hotel in Essex Junction because the airline I work for puts us up in it for Burlington. The Essex it's also a culinary college
I don't necessarily see that as a problem. Airports routinely handle multiple flights through a single C&I facility without necessarily separating the passengers from each flight. I don't see how a train station would be any different. Just like there is the C&I cleared Airside at airports, there will be a Railside at a station. Eurostars operate that way for example at London St. Pancras for passengers headed to Europe or arriving from there.Since I no longer believe the Vermonter will be extended to Montreal, Essex Jct - Burlington operation is off the table. Even if were to happen, how would Montreal Central's Track 23, where the Customs Taj Mahal would be built, be able to handle both a Vermonter and Ethan Allen within an hour or so of each other each way?
No but the arrivals and departures can be schedule an appropriate amount of time apart while passengers for both service can be processed simultaneously through C&I, that was my point. Afterall two flights can arrive at the same gate, one followed by the other, after the first aircraft is moved away from the gate, and the disembarkation of the passengers of the second flight need not be held up waiting for the passengers of the first flight to clear C&I. Similarly on the departure side.If the train's "jail" is Track 23 and only Track 23, like at Vancouver, fenced in with barbed wire, can both trains occupy Track 23 simultaneously ? I would think not. It is not like you would get off Track 15 as now and walk over to Track 23's facility.
Enter your email address to join: