sttom
OBS Chief
- Joined
- Jan 23, 2019
- Messages
- 824
Shovel ready or not, the original map is pretty pathetic and I can imagine the service levels being as underwhelming. Most of these added lines are going to add what 4 round trips per day max, some will be 2 and some 1. I know some would run more than that by 2035 (I hope at least) but still this is pretty pathetic. I know someone will say something to the effect of "this is a 30% increase in service, how dare you speak ill of it!!!" But should we happy with this after a decade of effectively no growth? 2% growth annually may be better than 0%, but being happy with it because some lines are "shovel ready" or some legislators have had their fancy tickled or the dumbest reason in my opinion, "this map is practical". I'm linking something that's 16 or so extra corridors on top of theirs, a few extensions of theirs, 9 long distance routes and 3 overnight routes and that is largely doable over 15 years. For a 15 year business plan, this is beyond pathetic. I didn't even check to see how much this would cost, but I can't see it either 1) being very much in the grande scheme of things or 2) their asking for funding to clear the NEC's maintenance back log and this is the pittance they'll promise the rest of us plebs to keep our Senators happy.