This project would design and install a new universal interlocking VELTRI at MP133 in Mystic, CT. Construction would include the installation of turn-outs, rail, ties, sub-grade, ballast, overhead catenary, signal transformers, signals cables, signal bridges, switch heater, switch machines, switch houses, instrument houses, and interlocking lighting. This new interlocking will be an Amtrak sole use asset.
This new interlocking will provide operating flexibility, improve reliability, allow for future maintenance outages and track possessions, and subdivide an 18-mile interlocking-to-interlocking segment into two shorter segments, allowing single track operation over a shorter distance during maintenance with less operational disruption. This will improve reliability.