Do you think they should reroute through Fallbrook/Camp Pendleton long term and then back towards SJC?
The wall is anticipated to be completed in mid-March, which will be followed by necessary track repair. Metrolink passenger rail service may begin as early as late March or early April.
Yep its for commuters and to give them a 10 hour or so working windowThe through trains have been loaded in the reservation system but the bus shuttles aren't there yet (showing as sold out).
It looks like they selected the trains to go through San Clemente around 7:30 in the morning at 6:30 in the evening.
Or a complete reversal of climate change inside two years and that, unfortunately, ain't gonna happen. Meanwhile we spend untold billions on mitigating what 100 years has wrought.Yup., Now we either need a long term barrier or a eventual inland routing of the tracks.