From CCJPA
The September LOSSAN board meeting was cancelled, so no agenda for me to peruse and find Metrolink/Coaster stats and why the Surfliner's OTP was so bad. It's an improvement from July which was 58.3%, but that was due to track work by BNSF between LA and Fullerton (requested by Metrolink and Amtrak). This is the second straight month of revenue decline for the Surfliner and with only one exception, March I believe, the Surfliner has had a ridership drop every month since October.Capitol Corridor August 2012
- Ridership: 146,232 riders; -5% vs. August 2011; +3 vs. prior YTD
- Revenue: $2,371,167; +3% vs. August 2011; 9% vs. prior YTD
- On-Time Performance: 92%, YTD OTP of 94%
- System Operating Ratio: 50% Fiscal YTD, 51% Calendar YTD
Pacific Surfliners August 2012:
- Ridership: 263,264 passengers; -5% vs. August 2011, and -6% below prior YTD - Ticket Revenue: -4% vs. August 2011 and +6% vs. prior YTD
- On-time performance for August 2012: 67% (YTD FY 2012 on-time performance: 75%)
San Joaquin August 2012:
- Ridership: 102,385 passengers +4% vs. August 2011, and +7% vs. prior YTD - Ticket Revenue only: +5% vs. August 2011, and +9% vs. prior YTD
- On-time performance for August 2012: 84% (YTD FY 2012 on-time performance: 88%)