neroden
Engineer
I think there's a solid business case for rerouting the LSL (not the CL) on the Michigan line. Or for running a second train 12 hours off of the LSL schedule, and running that on the Michigan line. Or for restoring a Michigan service train which goes from Dearborn to Toledo instead of to Pontiac, connecting to the Lake Shore Limited.
Any of the above. A real study using real avoidable-cost numbers could show which was best, but Amtrak can't even generate real avoidable-cost numbers for the existing operations, because their accouting is borked.
Any of the above. A real study using real avoidable-cost numbers could show which was best, but Amtrak can't even generate real avoidable-cost numbers for the existing operations, because their accouting is borked.