The T slowly rolling out a Cubic system to replace what Scheidt & Bachmann installed some 15 years ago.
As a Boston television station pointed out last year the contract with Cubic is costing far more than what New York City paid.
Scheidt & Bachmann was the low bidder over Cubic and they were also supposed to design equipment to collect fares on the commuter rail, ferries, and paratransit but gave up in 2012.