chrsjrcj
OBS Chief
For whatever it’s worth, I did decide to take advantage of the 50% off offer for my first joyride to Orlando this Friday and 2/3 of the seats appear taken.
They've built a thriving short-haul business, that now it's interfering with their plans for long-haul business. Success is killing them.This may (partly) be short-haul traffic blocking MCO-MIA folks. Having said that, 2500 pax/day would kick out less than 100/train (or a 35-40% load factor). That's not /too/ far off of 12/42.
There's also an inability to adapt, probably due to some existing constraints (equipment and slots/bridge openings, most likely, though station platforming limits in Miami might also come into play...I think the decision to scale MiamiCentral down from 8 platforms to 5 will prove to be a significant long-term goog on their part). I don't think they realized the presence of a "Cadillac commuter" market in South Florida (e.g. folks willing to semi-regularly pay for Premium). Note that the SF Premium Pass comes out to $15.725/ride if fully used ($629/40 rides), and that basically comes with a passable (if perhaps light) breakfast included if you show up a bit early, and it comes with complementary Uber rides at each end. I can think of more than a few places where that'd barely cover an overpriced continental breakfast, or times when $16 wouldn't cover the Ubers alone.They've built a thriving short-haul business, that now it's interfering with their plans for long-haul business. Success is killing them.
Could you explain what you mean here? Why would Amtrak ever have issues filling a train going from NYP-DC non stop (assuming they aren’t running 10 per day and ignoring Covid) and what benefits do infills have to Brightline?Brightline will soon learn the virtues of having more infill stations. Amtrak has struggled with similar issues on the NEC whenever they bravely tried to run one stop or non stop service between New York and Washington DC.
I am just stating an observed fact about Acelas, and before that Metroliners. I don't know why, but the nonstops have always failed so far. That is why there are none running today and for a while now. This has nothing to do with Covid. It has been the case since the late '70s.Could you explain what you mean here? Why would Amtrak ever have issues filling a train going from NYP-DC non stop (assuming they aren’t running 10 per day and ignoring Covid) and what benefits do infills have to Brightline?
I would love that too, but unfortunately the Space Coast station will most likely be in Cocoa given its proximity to Port Canaveral, the US's largest and world's second largest Cruise PortI will reiterate that if they had a station in downtown Melbourne I’d probably be on it at least monthly instead of driving.
Also note that in order to add more than one station per county, IIRC Brightline has to go ask CFX to redo that contract. Now, they'll probably have to talk that one over again due to the other Orlando/Tampa stuff *anyway*...I would love that too, but unfortunately the Space Coast station will most likely be in Cocoa given its proximity to Port Canaveral, the US's largest and world's second largest Cruise Port
I think it is more likely that several stations will come up in Brevard County when the County decides it wants to pull the trigger on its Commuter Rail Plan, and that has multiple stations in the Melbourne-Palm Bay segment. I would be surprised if Brightline decides to add more than one station in Brevard County, though the total length of its travel in Brevard County is longer than in any other county north of WPB.Also note that in order to add more than one station per county, IIRC Brightline has to go ask CFX to redo that contract. Now, they'll probably have to talk that one over again due to the other Orlando/Tampa stuff *anyway*...
Some part of me wouldn't be surprised if they dropped something in Vero. Stuart/Vero/Cocoa would be good pacing (about every 40-50 miles, each is a decent-sized population center [not huge but not trivial]).I think it is more likely that several stations will come up in Brevard County when the County decides it wants to pull the trigger on its Commuter Rail Plan, and that has multiple stations in the Melbourne-Palm Bay segment. I would be surprised if Brightline decides to add more than one station in Brevard County, though the total length of its travel in Brevard County is longer than in any other county north of WPB.
At what point does adding ever more stops become more of a liability than an asset? In other words, when does trying to tap every possible source of riders, begin to discourage longer distance travel, and negatively impact revenue?I am just stating an observed fact about Acelas, and before that Metroliners. I don't know why, but the nonstops have always failed so far. That is why there are none running today and for a while now. This has nothing to do with Covid. It has been the case since the late '70s.
Infills add city pairs and add passenger and ridership. It is of advantage for both Brightline and its potential customer base. It should be noted that they already added two infill stations between WPB and Miami and got a significant ridership boost from those. Of course at present probably Brightline needs more equipment first to make effective use of infills. However they do have plans for at least two infill stations between WPB and Orlando, and maybe more later. Mind you not all trains would or should stop at all infill stations.
With investment in infrastructure and appropriate scheduling to make different express-levels of service that bypass less-busy stations it's fine.At what point does adding ever more stops become more of a liability than an asset? In other words, when does trying to tap every possible source of riders, begin to discourage longer distance travel, and negatively impact revenue?
Probably a “magic number”, that is always changing….
This depends on frequency as well. If you run one train per hour and want to have all trains make all stops, that's one thing. On the other hand, if you run 2x/hr and run them on several stopping patterns, you can add a few more stops without messing with runtimes too badly (or by running a few "locals" a day and the others as semi-expresses).At what point does adding ever more stops become more of a liability than an asset? In other words, when does trying to tap every possible source of riders, begin to discourage longer distance travel, and negatively impact revenue?
Probably a “magic number”, that is always changing….
That's the thing - I think "every other hour" (which you have at Boca, and what you started with at Aventura) is workable for the smaller stations, and if I buy Brightline's stated demand projections, about three trains every two hours seems like a plausible result.I think different stopping patterns and trains that overtake others have a massive appeal for railfans, because, after all, that's what makes railroads interesting.
From the point of view of management such games just makes things complicated. I feel that an hourly service is just about the lowest level you can get away with if you want to speak of a service being "frequent". If you start dropping stops there will be stations that get a train stopping every two hours or even less, but still need to be fully staffed and so on, and so still have the full level of construction and operating costs for a reduced quality of service and also a reduced ability to generate revenue. At that point you need to be asking whether that station deserves to be built and served at all (unless they exist purely to siphon in subsidies from local communities and the passengers who use them are considered a necessary evil).
I like the idea of "expresses" but these need to run in addition to the base level schedule and not cannibalize it. I can imagine for example a base level hourly schedule doing all stops and a handful of expresses that run only during the morning and evening weekday peaks, thus taking pressure off the base level trains while also offering faster times and thus maybe even justifying some "express surcharge".
Coca will have a catchment area stretching from Titusville to Melbourne, and even parts of Palm Bay. We are talking a population of around 600K.Some part of me wouldn't be surprised if they dropped something in Vero. Stuart/Vero/Cocoa would be good pacing (about every 40-50 miles, each is a decent-sized population center [not huge but not trivial]).
I think capturing additional ridership for well managed revenue should almost always add revenue for additional riders. What is more relevant is the quality of the additional revenue, i.e. is it enhancing net earnings or depleting.At what point does adding ever more stops become more of a liability than an asset? In other words, when does trying to tap every possible source of riders, begin to discourage longer distance travel, and negatively impact revenue?
Probably a “magic number”, that is always changing….
I’m curious about that “catchment area”…Coca will have a catchment area stretching from Titusville to Melbourne, and even parts of Palm Bay. We are talking a population of around 600K.
In the various studies and EISs I believe they use something like 25 miles and 50 miles as two levels of catchment, and they have some percentage of total demand associated with each to come up with a net number.I’m curious about that “catchment area”…
How far would the “average” person drive, in order to then ride a train? Expressed as a percentage of train ride distance or time…
It also depends on which way you're going to get to the station vs your destination. Backtracking is a bit of a drag (e.g. driving from Stuart to WPB is fine going to Miami, but going to Orlando? Less so.).In the various studies and EISs I believe they use something like 25 miles and 50 miles as two levels of catchment, and they have some percentage of total demand associated with each to come up with a net number.
Forgive my confusion, but not sure what your answer means...drive 25 miles to ride 50 miles? That doesn't seem likely, unless I misunderstood what you said...In the various studies and EISs I believe they use something like 25 miles and 50 miles as two levels of catchment, and they have some percentage of total demand associated with each to come up with a net number.
It means at 25mi you have x% of all people making the trip choosing train, and 50mi y% where y < x. It’s a useful abstraction for planning because a 25mi shape is easier to reason about than a 45 minutes at 9am on a Tuesday shape.Forgive my confusion, but not sure what your answer means...drive 25 miles to ride 50 miles? That doesn't seem likely, unless I misunderstood what you said...
This. It unfortunately ignores othee nuances that influence the decision (either to take the train or which station to pick).It means at 25mi you have x% of all people making the trip choosing train, and 50mi y% where y < x. It’s a useful abstraction for planning because a 25mi shape is easier to reason about than a 45 minutes at 9am on a Tuesday shape.
Enter your email address to join: