leemell
Conductor
In this article, Dan Richard, board chairman of the Project admits that it really is under construction even though the start of construction has not been announced. Massive test pilings are being build on the Fresno River, 400+ properties are in acquisition, geologic and utility surveys are being made, etc.
Last edited by a moderator: