During normal operation the LSL combines/splits with the LSL Boston section at Albany. The P32 DM comes off/on, the Boston section is added or dropped and the train continues towards Chicago or Boston with the Boston power (usually 2 P42) and the P32 DM would take the NYP section on the return trip. There are times ( construction/maintenance projects) when the whole consist comes up from NYP and the Boston section is a cross platform transfer. None of this has an impact on Syracuse to Rhinecliff.