west point
Engineer
Amtrak now cancelled thru July 14rh. Any one with link to the inside gateway map. What would even be better if someone could come up with an ETT.
Maybe the press is preoccupied with the Surfside condo disaster.Yea it’s weird this hasn’t had any real mainstream press coverage…
I've been checking google news for anything about the dry canyon/hotlum trestle/bridge, and not much pops up. I hope that's a good sign. I saw the picture from the side posted in #53 above, hard to believe there could be so much damage to one section without affecting the strength of the remaining bridge.
I guess a more detailed report will come along eventually.
August 15th? Wow.Not looking good View attachment 23340
Bus bridges were announced to run through today. Whether or not they continue is unknown (unless an updated service alert has been posted).I see on Transitdocs and Amtrak's Track-a-Train that #14 is heading toward Eugene only 33 minutes late. Several stops in California have no data. So, they must be already running the bus bridge. Or a detour. I didn't check it out earlier to see the route.
Sure but it will cost you $$$$$$$$$$$$Anyone think I'll be able to convince Amtrak to reroute my PDX-EMY trip through CHI by taking the EB to CZ?
I just tiptoed through the reservation system and it shows Train 11 cancelled through Bastille Day, July 14th, from Seattle to Portland. It's an appropriate date, as in recent years they've been eager to cancel huge portions of long-distance trains, then been attacked in local media and by the state and national RPA's and finally run part of the route with a bus bridge where possible.Bus bridges were announced to run through today. Whether or not they continue is unknown (unless an updated service alert has been posted).
Where on Amtrak.com did you see that the bus bridge was open ended? I just looked after seeing your post and the service advisory still says 6/29-7/1.Amtrak.com is now showing a Bus Bridge between Sacramento and Klammath Falls effective 6/29-TBD for #11 and #14, which is good news since the Trains,aren't cancelled.
The Bad News is that the Overnight will be on a Bus, not in your Room or on the Train.
No word on whether Sleeping Car Charges will be reworked or Refunds issued to already Booked Passengers!