Freight train derailment at grade crossing

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

alpha3

Service Attendant
AU Supporting Member
Joined
Aug 29, 2018
Messages
218
Didn't see this posted anywhere; if I missed it, mods please delete this.

Moron of a truck driver hauling a huge concrete beam (did he really think he'd beat the train???) slowly moves thru a road crossing with a NS train bearing down at speed. Pretty spectacular crash. Nobody killed, but the locos and several cars derailed and the NS employees went to the hospital. Truck driver wasn't hurt.

 
Didn't see this posted anywhere; if I missed it, mods please delete this.

Moron of a truck driver hauling a huge concrete beam (did he really think he'd beat the train???) slowly moves thru a road crossing with a NS train bearing down at speed. Pretty spectacular crash. Nobody killed, but the locos and several cars derailed and the NS employees went to the hospital. Truck driver wasn't hurt.


I think I read the truck was stopped for a traffic light...so he should have stopped before the tracks till the light turned green.
 
The video above shows the moment of the crash and we see how the semi hauling a massive concrete beam couldn’t clear the tracks and got hit by a Norfolk Southern train. The 60-foot concrete barrier was transported to new construction on Apison Pike. Three locomotives and 10 boxcars derailed and a large amount of diesel fuel was spilled.
 
Whats freakin amazing is that I think the track has been relaid and all the cars cleared of it already. Them railroad companies sadly have handling these situations down pat it seems.

The bill for insurance companies involved is going to be rather hefty I would imagine.
 
an over dimension load needs railroad permission to cross any active rail line as per DOT, and rail traffic held till move is clear. it also requires escort vehicles or police .
The concrete beam was 134 feet long plus rig towing it.
The traffic light should have been flagged by police to continue the move without stopping.
 
The video above shows the moment of the crash and we see how the semi hauling a massive concrete beam couldn’t clear the tracks and got hit by a Norfolk Southern train. The 60-foot concrete barrier was transported to new construction on Apison Pike. Three locomotives and 10 boxcars derailed and a large amount of diesel fuel was spilled.
Based on appearance and the tail end of the video on WRAL suggests that this was a bridge beam, not a barrier, and was over 100 feet long. Also based on the video, the derailed cars were five boxcars, three covered hoppers, and two bulkhead flat cars carrying wood poles. Also based on the videos, the derailment itself was due to after striking the beam, the quick deceleration of the engines resulted in the cars and engines that derailed did so by "accordioning" due to the push of the following cars.
 
Last edited:
And (not that WE care) the bridge construction project will be set back many weeks, as that beam was custom made, and the replacement will take time to cure. Dumb truck driver.
"many weeks" sounds like the contractor may be looking for an excuse to justify delay. Concrete strength is usually defined by 30 day strength, which is usually somewhere around 90% of its ultimate strength. Usually for a precast beam you can move it in less time than this. The other time issue would be placing prestress rods, reinforcing and pouring time, and if the formwork has to be redone. Thus, "many weeks" sounds somewhat over the top.
 
A whole lot of Monday morning Quarterbacking going on (blame who did or did not) -
Rules regs not followed or tweeked without letting the right arm know what the left was doing -

There is a LESSON to be learned here - "Stupid is what stupid does UnChecked"

Fortunately no fatalities and what appears to be no long term injuries.

Indeed impressed about the clean-up and restoration of service to the rail line !!!
A lot of railroad rolling equipment sent prematurely to the recycle bone yard.
 
Even so, where were the oversize crews?
There is at present close to zero evidence in support of the hypothesis that it was the railroad's fault. What we all need to do is chill and wait for more credible information.
 
"many weeks" sounds like the contractor may be looking for an excuse to justify delay. Concrete strength is usually defined by 30 day strength, which is usually somewhere around 90% of its ultimate strength. Usually for a precast beam you can move it in less time than this. The other time issue would be placing prestress rods, reinforcing and pouring time, and if the formwork has to be redone. Thus, "many weeks" sounds somewhat over the top.
Depends on how busy the pre-cast plant is - they have to fit it in with their other orders.
 
Depends on how busy the pre-cast plant is - they have to fit it in with their other orders.
This morning's local paper, the Times-Free Press, has a good article about the aftermath of the incident.

Tennessee transportation officials said it's too early to tell what impact the loss of a concrete bridge beam destroyed Tuesday in a collision between a Norfolk Southern freight train and the semitrailer hauling it will have on the Apison Pike widening and realignment project.

The 106,000-pound, 134-foot-long concrete bridge beam was bound for the Tennessee Department of Transportation's $97.2 million road project in Collegedale when the truck and train collided, shattering the beam and derailing the train.

"Our contractor will work with their supplier to determine when another beam can be manufactured and delivered," TDOT spokeswoman Rae-Anne Bradley said Wednesday in an email. "TDOT is not involved in this. It will be between the contractor and their supplier to work out."


I don't know if the article is paywalled or not-been a subscriber for over 50 years-so here is the URL in case it isn't.

https://www.timesfreepress.com/news/2022/dec/22/apison-pike-project-delays-remain-unclear-after/
 
"police say Cruz-Vega proceeded across the grade crossing behind his lead escort car without first assuring his tractor trailer could completely clear the tracks, and that he failed to contact or make arrangements with Norfolk Southern about his delivery route."

Isn't the escort driver supposed to hold short of the tracks until the truck can clear?
I would have thought the trucking company (admittedly, I haven't read the story, so I don't know if he's an owner operator or an employee) make those arrangements rather than an individual driver?
 
Grade level crossings should have better tech or close the crossings. I’m thinking crossing cams that can be monitored in train cabs. Also sensors to sense a blockage when the light is red. I know that there is a way to improve those crossings that is cheaper than an overpass.
 
"many weeks" sounds like the contractor may be looking for an excuse to justify delay. Concrete strength is usually defined by 30 day strength, which is usually somewhere around 90% of its ultimate strength. Usually for a precast beam you can move it in less time than this. The other time issue would be placing prestress rods, reinforcing and pouring time, and if the formwork has to be redone. Thus, "many weeks" sounds somewhat over the top.

Unless the factory doesn't have a slot available immediately so may have to wait several weeks until one becomes available.
 