The last nest of NIMBYs has been bypassed. The Middlebury tunnel project has an EA and a FONSI as of July 21st.
http://vtrans.vermont.gov/projects/middlebury/environmental-assessment-individual-chapters
The money was already in place. The route can open without a Middlebury station if that gets delayed. Burlington needs a high platform, but that's it.
There are now temporary bridges in place, done as an emergency project becuase the old bridges were collapsing. Apparently, now that the paperwork has shut down the NIMBYs, major construction will be 2018 and 2019 and it should be ready to operate in 2020
http://vtrans.vermont.gov/projects/middlebury/environmental-assessment-individual-chapters
The money was already in place. The route can open without a Middlebury station if that gets delayed. Burlington needs a high platform, but that's it.
There are now temporary bridges in place, done as an emergency project becuase the old bridges were collapsing. Apparently, now that the paperwork has shut down the NIMBYs, major construction will be 2018 and 2019 and it should be ready to operate in 2020