Nothing beyond the corridor bi-levels is financed at present. However, two years back even those were not financed. So it is not unusual for something that is planned to be acquire post 2018 to not currently be financed. It is too far out for current financing concerns.As I understand it the new bilevel corridor cars for California and the Midwest will free up a few Superliner coach cars (and a whole lot of Horizons, but that is a nother matter). But aside from that there are only plans, that are not financed yet and nothing is on order or close to being ordered.There is a plan starting replacement after 2018 I believe. But afigg is the resident expert of such things and maybe he will chime in. It is all spelled out in the Fleet Plan re-published recently.I take it then, that there is no present plan to add/replace Superliners (as there seems to be for Viewliners)?Nothing specific. It is one of about a dozen different scenarios that have been considered. Does not mean it will necessarily happen or not.Did I miss something? I have not read anything about a City of New Orleans conversion to single level.I wonder what, other than additional cost, prevents reclaiming the two prototype Viewliner Sleepers shells and refitting them with new modules and trucks, so that two more Viewliner Sleepers become available in relatively short order. Specially if they plan to convert the CONO to single level to release Superliners for other LD trains, they will get very tight on Sleeper availability all over again.
The immediate next things that will be ordered are the 40 Acela Business Class cars. That will probably follow with exercise of the Viewliner options, which is not financed yet either.