The Indian Railway Minister visited the BEML Coach Factory to inaugurate the manufacture of the first Vande Bharat Sleeper train. These articulated sets initially of 16 coaches which may in the future be extended to 24 coaches, will be used to replace the current Rajdhani and Duronto Expresses. These are capable to accelerating to 130kph in under 2.5 minutes, compared to a little over 5 minutes that a 20 car train powered by a WAP-7 electric takes today, so one can see how merely replacing the current loco pulled sets by these articulated EMUs can significantly reduce running time given all the traffic and congestion related slowing down and speeding up that is involved even when not making a commercial halt. It is expected that the first couple of sets for testing will be ready in a few months.