George Harris
Engineer
For those that want to know more in detail: www.gao.gov/products/GAO-04-94The biggest problem was huge cost overrun and major schedule slippage..... Both caused by very poor project management. Indeed the last bits of the original project was finally completed last year, or was it early this year, the electrification of the third track into Boston.
It talks about how things should have been differently and better. It was done at the request of McCain, but that does not mean that it is phoney. Title: Amtrak's Mangement of Northeast Corridor Improvements Demonstrates Need for Applying Best Practices.