Once crossing the river at Hastings - there are two routes - the KCP river route thru St. Paul Park and theTwo Borealis items:
1. 100,000th passenger served on the Borealis 22 weeks after launch
https://www.jsonline.com/story/news...e-twin-cities-hits-100000-riders/75838498007/
https://www.progressiverailroading....ns-served-over-100000-riders-since-May--73161
2. September showed promising improvement in on-time performance
September
84.1% of all station stops were on time
75.5% of all customers arrived at their station on-time
May through August
62.2% of all station stops were on time
45.2% of all customers arrived at their station on-time
CPKC permitting Borealis to start before "required" improvments are in place does risk higher delays, but big picture I don't think it was a mistake to not wait for a couple more years for them to be done.
It feels like...and this could be a wrong imprssion...that unless the westbound is almost perfectly on time at Red Wing that it often takes a very ugly delay between there at St Paul. I seem to recall the reuiqrement improvements were mostly around La Crosse / Winona and also St Paul. Anybody know more about delays on that last segment RDW-STP and if improvements are underway?
Links to the stat sources:
September OT (page 12 Current Month stat)
https://www.amtrak.com/content/dam/...eptember-2024-Amtrak-Host-Railroad-Report.pdf
May through August (page 12, the Most Recent 12 Months stat)
https://www.amtrak.com/content/dam/...s/August-2024-Amtrak-Host-Railroad-Report.pdf
BNSF (hi-line) thru Cottage Grove - both of these merge at Newport - this is sometimes a chock point - then
further towards St. Paul at The Pigs Eye freight yard of KCP the tracks diverge into 4 tracks leading into the
Division Street Wye just east of SPUD (St Paul Union Depot) - this also presents a MAJOR problem for ease
of access to SPUD - 2 of these 4 tracks follow the river and 2 hug the bluff and these split off north of the
Wye - one to the BNSF Midway Division and the other the UP to points east in Wisconsin (Eau Claire) - there are some 60 plus trains daily transiting the Wye some simple short way-freights and others 100 or more cars
of various commodities. The 2 river tracks KCP and UP do not connect to the SPUD tracks - of the other 2
ONLY the inside track goes to SPUD the other does not.
Threading the needle here is the final piece de la resistance in delaying Amtrak Borealis from schedule !
No matter how timely the progress has been made up to and passed Pigs Eye - - -
WAIT FOR IT !
CLEARANCE TO TRANSIST THE WYE TO SPUD !
Google Map image detail zooom in/out for more definition:
https://www.google.com/maps/@44.950...try=ttu&g_ep=EgoyMDI0MTAyMy4wIKXMDSoASAFQAw==
Exasperating to come this far timely and snatch delay from the jaws of timeliness - - -
Crews and Agents catching heat from this - not their problem - - -
Certainly a slot for a 5 car 2 engine train should be made available with priority - - -
Safety issues concerns not withstanding