- Joined
- Feb 2, 2005
- Messages
- 980
Or we can convert the CL to single level equipment. Sure we need to gather the equipment and activate it, but that would be cheaper then wreck repairs.On that note. It’s thought that as of next week the Capitals summer consist will be 1 sleeper 1 coach 1 food service. That’s swirling all over other outlets. It appears and is backed up in a ways by the Steel rails article above that Amtrak is going with lack of equipment to run full consists now instead of lack of labor. If the comentary in the article is to be beleived Amtrak will not be doing a heavy overhaul on the Superliners and instead cannibalize them to keep a smaller fleet going. The official reason being why spend 2 million when we have a new equipment order coming as per the article.
Or we can convert the CL to single level equipment. Sure we need to gather the equipment and activate it, but that would be cheaper then wreck repairs.
With the addition of 25 single level sleepers there seem to be a math problem in there deployment. Can’t all be lay up for clogged restrooms.
Yes I agree with the opinion part, but still appreciate the OP posting this. It’s nice to see other people thought and opinions. Even when you know that it’s not quite correct, and someone is interpretation the facts to fit a scenario.I saw this posted on TO. Reading it earlier this publication has multiple inaccuracies - particularly the Andrew Selden piece. I would take any claims with a grain of salt.
Based on Amtraks recent "Track Record "( pun intended) for acquiring New Equipment, it'll only be about 10 years before the New LD Cars would be put into service!On that note. It’s thought that as of next week the Capitals summer consist will be 1 sleeper 1 coach 1 food service. That’s swirling all over other outlets. It appears and is backed up in a ways by the Steel rails article above that Amtrak is going with lack of equipment to run full consists now instead of lack of labor. If the comentary in the article is to be beleived Amtrak will not be doing a heavy overhaul on the Superliners and instead cannibalize them to keep a smaller fleet going. The official reason being why spend 2 million when we have a new equipment order coming as per the article.
Enter your email address to join: