Amtrak ought to add a commuter coach onto the end of NE Regional trains and sell bargain-priced tickets to attract the bus crowd.
Better yet, go INDIA style. Put hand grips and foot pads on the roof and sides of the rear car.
Amtrak ought to add a commuter coach onto the end of NE Regional trains and sell bargain-priced tickets to attract the bus crowd.
My understanding is that those traveling on the roof are zero revenue customers (otherwise known as ticketless travelers), so they would not fulfill the revenue mission that the OP had in mind anyway.Better yet, go INDIA style. Put hand grips and foot pads on the roof and sides of the rear car.
Thanks. Wikipedia had it under "Aeronautics" (which was wrong in the first place, it should have been "Aviation'). I changed it to be under "Transportation", and noted that it can also be applied to trains & buses.ASM - Available Seat Miles
CASM - Cost per Available Seat Mile
RASM - Revenue per Available Seat Mile
Standard terminology in the passenger transportation industry.
Amtrak does provide its consolidated CASM and RASM every month. Needless to say, its RASM is less than its CASM.
One of Amtrak's wrongdoings relative to LD trains is erroneously claiming that they are still under the restriction placed on them by Congress at one time preventing them from adding any LD trains without getting Congress's permission. Unfortunately Congress is collectively dumb enough not to have added a simple sentence stating that Amtrak is no longer under that restriction.
But the enormous success of many LCCs in the airline industry while full service airlines struggle to survive suggests that in general most likely all Coach service cramming passengers is a winner over more luxurious service, most unfortunately, I might add.
You know, I'm conflicted about this one. Part of the mystique of the Long Distance trains is the low speed. I guess the decision has to be made, are they per se transportation across those long distances, or are they more of a way to see the countryside and/or scenery? I lean toward the latter. Like I just said in another thread, the one time I have ridden a LD train was the Coast Starlight back on January 24, 2003, on my End of Active Obligated Service. The Armed Forces pay for your ride back to you home of record -- if you drive they pay for the gas, if you fly they pay for the ticket, if you go on a train they pay for it. So I went with an expensive stateroom, $400 ride, from Seattle to San Jose. It took 24 hours. It was great, I very much enjoyed it.
Of course, if I wanted to go from San Jose to Seattle at high speed, say to go to a Bring Your Own Computer LAN Party up there over a weekend, I would just fly, and get there in about two hours. No wheel on rail train can get close to that speed at that distance (if it's a short distance under 200 miles then yeah, HSR is going to be about the same speed. but not 800 miles). The French TGV for example averages 173, that would take 4.6 hours best case scenario, so even if we invested the billions and billions it would take to acheive that, the private sector product would still be a LOT faster. I guess I wouldn't object if we could do it cheaply though, say under 1 billion.
So yeah being in the more conservative wing of the Democratic Party, I would say, leave the LD trains as they are, maybe contract somebody like Aramark to do the hotel features (the staterooms, the cafe car, the observation car) if that saves money.
I could support increasing the speed as much as we can without spending an inordinate amount of money. I think right now they average 35 or something like that. The thing if you increase them to 70 or more, you no longer have an overnight train and you wouldn't sleep on the train etc. So now it's a totally different experience, and I'm not sure it's worth spending much money on it, because at the end of the day, for high speed long distance, the private sector has that covered with aircraft. I think the top speed on most of the track for Coast Starlight is probably 79, right? Like Caltrain down here in the Bay Area? So in theory it should be possible to get it to average more like 70 than 35. Not sure what that would entail. Maybe one of the railroad engineers on here can tell us what all that would take and if it's plausible for a small amount of money, again I would say under 1 billion per LD train is the max I would support.
Keep in mind the Long Distance trains also serve many small cities and communities sometimes as the only public transportation. Amtrak already eliminated some of the stops. As long as the train makes the stops, it will be impossible to increase the speed.
The armchair calculator and timetable in hand magic wand solution?Just get rid of the slow sections so trains can go 80 to 90 MPH on many stretches. a 60 MPH average including stops would get 10-1/2 hours ATL <> WAS. Palmetto 10 hours WAS <> Savannah, 21 hours NYP - MIA, 13 hours for Capitol probably no possible due to mountains,
Keep in mind the Long Distance trains also serve many small cities and communities sometimes as the only public transportation. Amtrak already eliminated some of the stops. As long as the train makes the stops, it will be impossible to increase the speed.
In my experience some of the fastest trains in the world stop and start much more frequently than any of Amtrak's Long Distance trains.Keep in mind the Long Distance trains also serve many small cities and communities sometimes as the only public transportation. Amtrak already eliminated some of the stops. As long as the train makes the stops, it will be impossible to increase the speed.
A couple of points. The long distance trains don’t have to decide what they need to be; they can be many things. The name trains of the past like the California Zephyr, the Empire Builder and Silver Meteor were all things. Some people took them all the way on vacation. Some people used them for business. Some people used them to visit family, and on and on. Just because there are rail cruises out there doesn’t mean that a well run, long distance train can’t be all things. Second, contracting out isn’t the panacea. You lose a lot of control and it costs more. Savings, when there are any, are usually done to support the decision to outsource. Once outsourced, your at the mercy of contractors who low ball to get the work, and then jack up the prices. Experience with contracting out shows it cost $1.85 for every $1 spent pre contracting out. Any savings are usually accomplished by cutting employee salaries and benefits to pay for contractor overhead. That’s even if Amtrak could find a contractor willing to do it which is doubtful. Good management, good labor relations, good equipment, good schedules, an expanded route system, and good marketing will solve all Amtrak’s problems. Start with a focus on fundamentals and a commitment to grow the business. The rest will come along.You know, I'm conflicted about this one. Part of the mystique of the Long Distance trains is the low speed. I guess the decision has to be made, are they per se transportation across those long distances, or are they more of a way to see the countryside and/or scenery? I lean toward the latter. Like I just said in another thread, the one time I have ridden a LD train was the Coast Starlight back on January 24, 2003, on my End of Active Obligated Service. The Armed Forces pay for your ride back to you home of record -- if you drive they pay for the gas, if you fly they pay for the ticket, if you go on a train they pay for it. So I went with an expensive stateroom, $400 ride, from Seattle to San Jose. It took 24 hours. It was great, I very much enjoyed it.
Of course, if I wanted to go from San Jose to Seattle at high speed, say to go to a Bring Your Own Computer LAN Party up there over a weekend, I would just fly, and get there in about two hours. No wheel on rail train can get close to that speed at that distance (if it's a short distance under 200 miles then yeah, HSR is going to be about the same speed. but not 800 miles). The French TGV for example averages 173, that would take 4.6 hours best case scenario, so even if we invested the billions and billions it would take to acheive that, the private sector product would still be a LOT faster. I guess I wouldn't object if we could do it cheaply though, say under 1 billion.
So yeah being in the more conservative wing of the Democratic Party, I would say, leave the LD trains as they are, maybe contract somebody like Aramark to do the hotel features (the staterooms, the cafe car, the observation car) if that saves money.
I could support increasing the speed as much as we can without spending an inordinate amount of money. I think right now they average 35 or something like that. The thing if you increase them to 70 or more, you no longer have an overnight train and you wouldn't sleep on the train etc. So now it's a totally different experience, and I'm not sure it's worth spending much money on it, because at the end of the day, for high speed long distance, the private sector has that covered with aircraft. I think the top speed on most of the track for Coast Starlight is probably 79, right? Like Caltrain down here in the Bay Area? So in theory it should be possible to get it to average more like 70 than 35. Not sure what that would entail. Maybe one of the railroad engineers on here can tell us what all that would take and if it's plausible for a small amount of money, again I would say under 1 billion per LD train is the max I would support.
Good management, good labor relations, good equipment, good schedules, an expanded route system, and good marketing will solve all Amtrak’s problems. Start with a focus on fundamentals and a commitment to grow the business. The rest will come along.
What really matters is getting control of dispatching and getting a solid contract in place for track maintenance. Doing that might require an order of magnitude less money than buying up property even with the exercise of eminent domain.Well, I'd say start with getting control of the tracks or getting them into the hands of cooperative owners, but they ARE working on that. After that, yes, what you said
Not so sure about the pricing on that.What really matters is getting control of dispatching and getting a solid contract in place for track maintenance. Doing that might require an order of magnitude less money than buying up property even with the exercise of eminent domain.
What I had in mind is something like the deal that NYSDOT struck with CSX on the Poughkeepsie - Hoffmans section of the Water Level Route.Not so sure about the pricing on that.
Dispatching is usually the big fight, yes.
If a government pays for track maintenance and doesn't have ownership rights, it's basically getting cheated -- it's a flat out value giveaway from taxpayers to privateers. This ends up costing more in the long run.
If a government pays for track maintenance and retains some sort of ownership rights in the track it maintains and upgrades, through a lease or ownership rights of the physical materials in the track, or something -- then in a few decades, typically the freight railroad will sell the land to a non-railroad company, who will then sell the land to a government at reasonable prices (as happened with the Metro-North lines, and there are examples in California too).
Apparently the residual value of the land is not valued that highly by the freight operators.
Given that governments often don't like to pay upfront, I suppose the most likely outcome is effectively "rent-to-own" transfers from the private owners to government; frankly, there have been a lot of deals which ended up working this way in my lifetime already.
Which makes me wonder about the next-generation of long-distance seated cars. With wider more accessible aisles and narrower seats it's going to be really hard to have 2:2 seating that's comfortable for overnight sleeping. We might see long-distance economy seating that's identical to corridor seat (albeit not bidirectional) with assumption that most passengers are using for corridor length trips. Long-distance distance passengers will be expected to upgrade to a long-distance Business Class (basically a 2:1 version of current long-distance coach, maybe with more recline) or a sleeping car.LD trains provide 2 separate services. Sleeper service mainly is for distances 700-1000 miles. Coach passengers average 100 - 300 miles although some few are longer.
My understanding is that each seat is losing about 1" of width with the Siemens Venture cars, as opposed to the Amfleet/Horizon cars they are replacing. Someone please correct that if I'm wrong.Which makes me wonder about the next-generation of long-distance seated cars. With wider more accessible aisles and narrower seats it's going to be really hard to have 2:2 seating that's comfortable for overnight sleeping. We might see long-distance economy seating that's identical to corridor seat (albeit not bidirectional) with assumption that most passengers are using for corridor length trips. Long-distance distance passengers will be expected to upgrade to a long-distance Business Class (basically a 2:1 version of current long-distance coach, maybe with more recline) or a sleeping car.
With the recent accidents/derailments on the EB and SWC we have seen absolutely no plan to replace the large amount of lost equipment. If this policy remains there will be no LD service in a few years or some routes could go to single level trains.
Enter your email address to join: