Search results

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. GDRRiley

    Gateway Project/New York Penn Station capacity improvement

    The existing tunnels need work that can only be done by shutting them down. They got flooded badly with Sandy and thats kicked off a whole host of problems.
  2. GDRRiley

    Train Washing Facilities updates?

    Goleta will be interesting given the trainsets are going to layover on 2 different spurs with the only connection being the mainline. SLO will be getting one as part of Central Coast Layover Facility
  3. GDRRiley

    Amtrak expected to lose Metrolink operating contract

    my mistake, I should have remember that from Chatsworth Board meeting happened yesterday. Contract was discussed, the directors were skeptical and concerned with the staff recommendation to give Alstom the contract. They wanted more time to consider the contract, and answer questions . So a...
  4. GDRRiley

    California provides 310M to support Amtrak & regional rail upgrades

    Out of 1,333M of Transit & Intercity Rail Capital Program, 310M went to Amtrak or joint Amtrak & regional rail improvements. From north to south: 14M to Capital Corridor JPA for Santa Clara Interlocking, Agnew Siding and Sacramento Valley Station active mobility improvements. Santa Clara...
  5. GDRRiley

    Amtrak expected to lose Metrolink operating contract

    Amtrak has operated Metrolink sense the start but with a move from 3 contracts; train operations, equipment maintenance and MOW maintenance to a single combined operations and maintenance contract they are expected to lose it from Alstom. Bombardier now Alstom previously did equipment...
  6. GDRRiley

    Bill introduced to allow Amtrak to sue freight railroads

    Railroads don't sell slices of right of way they aren't using, they'll usually allow easements for utilities. For example out here in California most former SP mainlines have 80-120ft while 2nd rate mains and branch lines have 45-70ft.
  7. GDRRiley

    San Joaquins discussion

    I wouldn't trust On-track-on-line over the documents from SJJPA and the state
  8. GDRRiley

    How far can they extend the Amtrak California Capitol Corridor?

    There is a few freight moves south of San Jose but it drops down to less than daily south of Salinas. Salinas is the southern end of high frequency service with the state outlining 30 min service to SF or Oakland. Salinas to Santa Barbra is currently planned as "less than bi hourly" its already...
  9. GDRRiley

    How far can they extend the Amtrak California Capitol Corridor?

    https://zierke.com/shasta_route/ This one? it didn't have any cost associated with it
  10. GDRRiley

    Acela 21 (Avelia Liberty) development, testing and deployment (2Q 2024)

    Highly unlikely as much as amtrak needs them as soon as possible.
  11. GDRRiley

    Caltrain starting public electric service on August 11, 2024

    Caltrian expects 16 total sets to be delivered by the end of next week. 311/312 isn't expected to be back till early 2025
  12. GDRRiley

    SunRail Deland extension construction

    Unless they can speed the line up and get to the point where 1:35 runs with a 10 min turnback they can't even try and get crews to work 3RT. If they could do so moving to 2 crew sets who work 3 on 4 off alternating with 4 on 3 off would allow weekend service with a smaller amount of new crews.
  13. GDRRiley

    Caltrain starting public electric service on August 11, 2024

    P42 I've seen about 1 a day during my transfer at palo alto. they really aren't running much in the mix right now and it seems like they are moving them between different trains constantly
  14. GDRRiley

    Future Amtrak Equipment and ADA ideas

    some routes could use them but yes they are on the tall side at 18ft 1.5in tall which won't fit in some key tunnels, thats also a high floor design
  15. GDRRiley

    Future Amtrak Equipment and ADA ideas

    Amtrak to do this proposal right would be a lot more open in the design and just lay out standards they need to meet that aren't crazy 110mph top speed, fit superliner clearance plus 2in extra vertically, can operate in these conditions, ect. Thats how Europe does it, Amtrak went here is the...
  16. GDRRiley

    Caltrain starting public electric service on August 11, 2024

    Nope its based on if you get grant money from Air Quality districts. The CARB rule that would create a 23 year since last rebuild clause hasn't gone into affect and is being challenged. You don't have to take it but they'll cover upto 80% of the cost of a new locomotive for a public agency. They...
  17. GDRRiley

    Caltrain starting public electric service on August 11, 2024

    if it was really a long term issue they could borrow some units from Amtrak or a freight railroad. The F40 are for scrap or T4 rebuild only, the gallery cars though are going to be a big win for someone, now they may not be available till 2029 after metrolink uses them for the 2028 games.
  18. GDRRiley

    Caltrain starting public electric service on August 11, 2024

    transfer at Diridon unless its the battery set which maybe able to go the whole way
  19. GDRRiley

    San Joaquins discussion

    6 vending machines in 2 cars for a 6 hour run, that will become 4 max with the shortening to Merced and the extension to Chico
Back
Top