Acela 21 (Avelia Liberty) development, testing and deployment (2025)

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

pennyk

Amtrak Rider
Staff member
Administator
Moderator
Gathering Team Member
Joined
Jul 5, 2009
Messages
19,091
Location
Orlando, FL
Crew Training begins this month. 😊
Finally.

Just finishing off this project though it remains to be seen if other trainsets need the same testing.

Nightly testing of Avelia Liberty between County and Ham came to a halt in the beginning of September 2024 except for a single run last month. Captures of KP2022's radio traffic are when the train is near the turnaround point in New Brunswick.

Night 12/18 - morning 12/19 (2024)

9:50PM - KP2022 is ready west; dispatcher could not provide absolute block to KP2022
9:57PM - dispatcher to KP2022: "here we go"
10:31PM - dispatcher needs briefing with KP2022 (new dispatcher shift)
10:43PM - "good runner, KP" (traction motor sound came through radio making it clear it wasn't a Charger)
11:32PM - KP2022 ready west, good runner, etc.
(NJT #3742 departs later since November so no complaints from them this time)
12:16AM - KP2022 clear signal, good brake test, good runner
 
Someone linked from Reddit: https://safereddit.com/r/Amtrak/comments/1hyyitb/acela_avelia_crew_training_begins_this_month/ (safereddit.com link)

Link implies they’re running them nightly again
Nobody said this. In case they were referring to me, all I documented was a single run in December and I suggested there might be more County - Ham testing for each trainset.

However, someone on another forum alleged (on Saturday) that there might be a set out this week for brake testing.
 
Thanks JL. It's not your fault, but these dribs and drabs creeping along are frustratrating. You all know what I mean, Amtrak's lack of boldly taking these trains and really aggressively putting them thru their paces. I just don't see it. And the FRA also just sit back and yawns, working when they feel like it.
 
Thanks JL. It's not your fault, but these dribs and drabs creeping along are frustratrating. You all know what I mean, Amtrak's lack of boldly taking these trains and really aggressively putting them thru their paces. I just don't see it. And the FRA also just sit back and yawns, working when they feel like it.
Just as a comparison, check out the East Broad Top Railroad, where they're restoring a vintage steam locomotive ("No. 15"):

https://eastbroadtop.com/about/

Down in the "Restoration FAQs section, there's this:

"When will No. 15 be finished? Has any progress been made?
Our policy is never to release any estimated completion date for a restoration project, especially in our steam program. The amount of variables in restoring vintage equipment makes it impossible to estimate a timeline accurately, and we want to ensure that our staff can focus on completing the job safely and efficiently. Be sure to follow our social media for periodic updates and announcement"


Just replace "steam program" and "vintage equipment" with "Tier 3 HSR" and the same applies to the completion date for the Acela 2s. And at least with the Acela 2s, we see evidence that they're testing the equipment.
 
Just as a comparison, check out the East Broad Top Railroad, where they're restoring a vintage steam locomotive ("No. 15"):

https://eastbroadtop.com/about/

Down in the "Restoration FAQs section, there's this:

"When will No. 15 be finished? Has any progress been made?
Our policy is never to release any estimated completion date for a restoration project, especially in our steam program. The amount of variables in restoring vintage equipment makes it impossible to estimate a timeline accurately, and we want to ensure that our staff can focus on completing the job safely and efficiently. Be sure to follow our social media for periodic updates and announcement"


Just replace "steam program" and "vintage equipment" with "Tier 3 HSR" and the same applies to the completion date for the Acela 2s. And at least with the Acela 2s, we see evidence that they're testing the equipment.
Is the East Broad Top Railroad a passenger railroad funded with taxpayer dollars? Do they transport upwards of 30 million people a year? If the answers to those questions are no, which I suspect they are, then the situations don’t compare. If Amtrak were restoring a steam engine for excursion use then they would be justified in silence. But this is a multi-billion dollar contract that is severely delayed and has seemingly been mismanaged. Like every other passenger car order Amtrak has made in the last 25 years. Amtrak should be more forthcoming, the public deserves it.
 
Is the East Broad Top Railroad a passenger railroad funded with taxpayer dollars? Do they transport upwards of 30 million people a year? If the answers to those questions are no, which I suspect they are, then the situations don’t compare. If Amtrak were restoring a steam engine for excursion use then they would be justified in silence. But this is a multi-billion dollar contract that is severely delayed and has seemingly been mismanaged. Like every other passenger car order Amtrak has made in the last 25 years. Amtrak should be more forthcoming, the public deserves it.
What makes you think the contract was mismanaged? Do you have some sort of insider information? And if you did, you would probably be in a good position to direct your criticisms to people who might be able to something about it rather than posting unhelpful criticism to a railfan forum website. Yeah, maybe they made a mistake letting the vendor build stuff before the model was validated and approved by the FRA, but if they hadn't, the project would probably have been even more delayed.

I don't blame Amtrak for being tight lipped about this. When I cook dinner, it's kind of hard to get the job done if all kinds of people are looking over my shoulder, giving me advice and whining about when dinner will be ready. And then they would complain because the roast was undercooked, to their taste. When Amtrak feels they're ready, they'll announce a start date. Maybe they'll have a "soft opening" as part of the test plan to make sure that when they do the inaugural run with the dignitaries on board, there are no hitches. Remember the first Acelas, which had to be withdrawn for some time because of manufacturers' defects.
 
Back
Top