The Green Line Extension (GLX) is the first significant extension since 1959 of the venerable light rail system which started as the first subway in North America in 1897. The extension has 2 branches one to Medford and a shorter branch to Union Sq. Somerville. These extensions will serve an area that has been devoid of rail service for some time.
Here is an article from WBUR the local NPR station about the extension which includes a short video preview of the Union Sq. branch due to open in March.
https://www.wbur.org/news/2022/02/03/green-line-extension-preview-ride-mbta?linkId=150715743
Here is an article from WBUR the local NPR station about the extension which includes a short video preview of the Union Sq. branch due to open in March.
https://www.wbur.org/news/2022/02/03/green-line-extension-preview-ride-mbta?linkId=150715743