Two significant river crossings(St. Johns and Econlockhatchee Rivers) and one significant causeway across wetlands (St. Johns River Swampland) plus several flyovers and duck unders at various cross roads. Also built in general on mush half of the way even where it is not on viaducts. It takes the foundation formation to settle down and stabilize.In this case, I think you have at least some bridges, etc. that need engineering work done. Ideally it would be a bit quicker for obvious reasons, but given that this is a fresh ROW it doesn't seem horridly unreasonable...and if nothing else, we can hope that this isn't an over-promised timetable.
Someone posted a photo of stacks of concrete ties that have been warehoused near the branching point at Cocoa for use on the new track, both along SR 528 and the new (restored) second track along FECR I suppose.