North Portal bridge railfan alert

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Span 2 has been delivered
Any proof or is this just extrapolation from the 30 hour timeframe from last time?

The three tugs started moving about 10 mins ago:
https://www.myshiptracking.com/?mmsi=367704190
https://www.myshiptracking.com/?mmsi=368348110
https://www.myshiptracking.com/?mmsi=367797720

There's a gap of trains between 2AM (#66) and 4AM. The estimate comes directly from the tug operator on the Facebook page:

The remaining steps are expected to be completed tonight:
Friday, January 17th
2:00 am (0200) Depart Lay Berth
3:00 am (0300) Arrival at Amtrak Portal Bridge Site
 
Back
Top