nti1094
Service Attendant
- Joined
- Apr 9, 2015
- Messages
- 152
Nor have I heard any mention at all of this issue either officially or otherwise from the board. The only ongoing issue I know of is that they are working out the maintenance and CONOPS that take into consideration that will be going on at the ACE facility in Stockton. (a sign of the further deteriorating relationship with Amtrak I suppose). I certainly hope it turns out to be a source issue and not a parts issue. We are talking about ripping out the plumbing for almost 50 cars at this point!Interesting. I’m not sure if maybe it was missed somewhere, but I don’t recall ever once reading about any of that in the NGEC meeting notes.