The National Transportation Safety Board has issued its preliminary report: RRD22MR010.aspx.
The National Transportation Safety Board has issued its preliminary report: RRD22MR010.aspx.
Since Amtrak did not design or construct the crossing, has it been absolved of any responsibility and/or financial liability for this accident?
So here's what the NTSB says about the crash. I don't think anybody is too surprised.
https://apnews.com/article/missouri...ecoReel&utm_medium=articlePage&utm_id=Taboola
Poorly designed crossing contributed to fatal 2022 Missouri Amtrak derailment, officials say | AP News
JOSH FUNK
Updated 3:25 PM MDT, August 2, 2023
A dump truck driver last year may have never seen an oncoming Amtrak train before it was too late, federal investigators concluded in a report, finding that a steep, poorly designed railroad crossing in rural Missouri contributed to last year’s fatal Amtrak derailment that killed four people and injured 146 others.
The National Transportation Safety Board said Wednesday that the 45-degree angle where the road crossed the tracks made it hard for the dump truck driver to see the approaching train, and the steep approach discouraged the truck driver from stopping beforehand.
“The safest rail grade crossing is no rail grade crossing. But at the very least, every road-rail intersection should have an adequate design to ensure proper visibility so drivers can see oncoming trains,” NTSB Chair Jennifer Homendy said. “Communities across the country deserve safer crossings so these types of accidents don’t happen again.”
The NTSB said the dump truck driver ignored a stop sign before continuing through the crossing near Mendon at a speed of about 5 mph (8 kph). The train was only able to slow 2 mph to 87 mph (140 kph) after the crew saw the truck approaching and slammed on the brakes.
Amtrak's contracts with host railroads completely indemnify the railroads, regardless of fault. The county or whoever was responsible for installing and maintaining that crossing may wind up being on the hook for something here. Amtrak's indemnification likely doesn't extend to them.Since Amtrak did not design or construct the crossing, has it been absolved of any responsibility and/or financial liability for this accident?
thought I posted this but Missouri Gov has approved a 18.5 million dollar funding which will close I believe it is 16 crossings including the one involved in the accident
Same here,I hope they do a robust impact study on the grade crossing closures.
How difficult is it to close a crossing? I guess any plan like this brings NIMBYs out of the woodwork because they see their fundamental freedoms threatened by having to take a detour of a few minutes, and will threatens to entangle the project in years of red tape while a dangerous situation persists.I thought I posted this but Missouri Gov has approved a 18.5 million dollar funding which will close I believe it is 16 crossings including the one involved in the accident and it will add lights and crossing arms to 27 more mainly on routes covered by the SW Chief, Texas Eagle and the StL- KC trains
Closing a crossing can have both negative and positive benefits for those in the proximity...hopefully they balance out.How difficult is it to close a crossing? I guess any plan like this brings NIMBYs out of the woodwork because they see their fundamental freedoms threatened by having to take a detour of a few minutes, and will threatens to entangle the project in years of red tape while a dangerous situation persists.
In some cases the road pre-dates the construction of the railroad. In other cases, especially in the 19th Century, I believe that railroads sometimes agreed to maintain and allow private crossings as part of the negotiation for being allowed to cross a farmer's land, etc. Probably some of these private crossings have been discontinued as a result of subsequent negotiations.How difficult is it to close a crossing? I guess any plan like this brings NIMBYs out of the woodwork because they see their fundamental freedoms threatened by having to take a detour of a few minutes, and will threatens to entangle the project in years of red tape while a dangerous situation persists.
This makes no sense. The road in question is a N - S road on a 45 degree angle to BNSF. About 1 mile further east there is an E-W identical crossing that has to remain as it will the only access to the area NW of BNSF. Also a 45 degree crossing steep approaches. Same identical construction. Or is the state going to change that crossing to make its approaches level?I hope they do a robust impact study on the grade crossing closures.
Enter your email address to join: