Search results

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. D

    Airo - Amfleet I replacement Siemens Inter City Trainsets (ICT) (2-3Q 2024)

    Amtrak Equipment Procurement Update as of 4-25-24: On the Airo trainset: This procurement is moving full speed ahead. They are closing out design efforts. Working on FAIsd and wrapping up work on various systems. 40 vehicles are in production – 4 Locomotives and the rest (36) are coaches. The...
  2. D

    ABB Scandi/Adtranz/Bombardier IC3 Flex discussion

    The Swedish RC class is downgraded to freight only for most of fleet
  3. D

    Amtrak Police

    In general their Jurisdiction is entire state, that Amtrak operates in.
  4. D

    The site for Next Generation Equipment Commitee is down

    it seems for about a week now that the ngec.org is down.
  5. D

    The track circuit triggering issue (CN, Amtrak)

    If they only maintained the axle ground brushes better there would not be a problem. Each axle has a carbon brush grounding it to Car body, maintenance has been shoddy on them.
  6. D

    SEPTA cancels contract with CRRC

    The Contract for 145 Multi Levels is canceled, The cars ordered in 2017 were way overdue and lots of problems. https://www.inquirer.com/transportation/septa-train-car-contract-canceled-20240412.html?fbclid=IwAR05tNHFczm9BIew7hUa3AaoySB7gkDiaPWyxuDP6gJFIYbpVazQ-QjKlhY and...
  7. D

    Amtrak Siemens Charger Locomotive (SC44, ALC42, ALC42E) (2Q 2024)

    The equipment for Empire service will not be Amtrak, but NYDOT and they did not order Airo sets
  8. D

    Amtrak Siemens Charger Locomotive (SC44, ALC42, ALC42E) (2Q 2024)

    Amtrak (state of NY ) has not ordered dual modes yet. but base order is 125 already from original 75.
  9. D

    MNRR Dual Mode Chargers discussion

    roof exit is a FRA mandate but on dual modes there will be a modification to fireman's side window. egress is over console and a rope type ladder down to coupler level . note: that picture in my post is not actual Metro North unit but a photoshop. the trucks lack third rail gear and fireman's...
  10. D

    MNRR Dual Mode Chargers discussion

    Reason third rail operations is expanded is that new Dual modes have a energy storage module that will keep HEP alive in gaps. so HVAC's do not get damaged. the P32acdm's did not have an option for that. The module does not power locomotive in gaps.
  11. D

    Acela 21 (Avelia Liberty) development, testing and deployment (2018 - 1Q 2024)

    not sure, report is from New Generation Equipment Committee.
  12. D

    MNRR Dual Mode Chargers discussion

    #301 just about ready for testing. https://ngec.org/wp-content/uploads/2024/03/305-activities-report-monthly-2-29-24.pdf photoshop picture only for reference :
  13. D

    Acela 21 (Avelia Liberty) development, testing and deployment (2018 - 1Q 2024)

    from NEGR site : Amtrak Equipment Procurement Update as of 2-29-24: On the Acela: Staging and testing continues – they are about halfway through Stage 1 and are optimistic that it can be wrapped up in a month or two and move on to stage 2.On the Airo trainset: Progress is strong – there are 34...
  14. D

    Budd RDC technical stuff

    now your getting confusing , transition has nothing to do with gears or shifting, its reconfiguring the electric circuit to traction motors. Series - parallel - and field shunting , the mechanical configuration does not change.
  15. D

    Budd RDC technical stuff

    not sure were you got that drawing but here is picture of real RDC throttle
  16. D

    Budd RDC technical stuff

    Having worked and ran both RDC and SPV as Electrician/ MofE foreman/Engineer . no source from outside.
  17. D

    Budd RDC technical stuff

    The RDC only had 4 trottle settings no control of gears it had TC (transmission/clutch)and 1- 2 -3 as trottle settings accomplished by 3 throttle solenoids on engine. the SPV had a stepless air trottle controlling engine speed between 90 and 110 lbs of brake pipe pressure, the transmission was...
  18. D

    MNRR Dual Mode Chargers discussion

    latest on Metro North Dual mode chargers. https://ngec.org/wp-content/uploads/2024/02/Metro-North-Railroad-Siemens-NGEC-2024-PPT.pdf?fbclid=IwAR1xqwzmhHGN2GOwQFxI4lbHA8wBRoeSeMuIEvfwm4vCJ4H1UhhEhr5yJqM
  19. D

    Long Distance (LD) fleet replacement discussion (2022 - 2024Q1)

    120" is not interior wide, but car width I believe, distract about 5 inches on each side for insulation and wall panels.
Back
Top