west point
Engineer
Thanks gentlemen. I had my suspicions that the Albany and beyond trains with batteries in the battery car were designs not finalized. If or not there is a powered truck on front truck will affect many operational possibilities as well. As you pointed out will there even be seats? The only item for sure seems to be no CAT PAN. However, there seems to be no reason that a CAT equipped train could not go to Albany as CAT is installed to the end of the west side access tunnel at NYP? But the Battery car trains do have the advantage of being able to go to NYG.