Qapla
Engineer
Then again - since some of the HST that exist are entirely raised - building like that would solve the problem of grade crossings
Then again - since some of the HST that exist are entirely raised - building like that would solve the problem of grade crossings
Great comment. In a recent discussion, a point was made of how much bang for the buck you could get by making 30 mph track 50 mph, and 50 mph 79. Much easier than being obsessed about 110. We can do this. Reasonable speed, reliable, multiple frequency trains are the answer.1. The North American rail system is so Third World that expecting to build 320 km/hr (200 mph) high speed rail is perhaps too much of a stretch for any known method of financing it. After all, you need to crawl before you can walk, and you need to walk before you can run marathons. If you can build a system that has 100 - 130 km/hr (60-80 mph) end to end average speed, it can be perfectly competitive with driving, and a lot less expensive to build. Most of this can probably be done by relatively minor expansion of existing infrastructure and additional track maintenance. In the real hinterlands where there are only one or two long-distance trains a day, what is mainly needed are more and longer sidings.
2. That said, there are a few places where the existing rail routes are either so curvy and have such high grades or have out of the way routes that bypass current population centers that some new tracks would be in order. I'm thinking mostly of the routes that cross the central Appalachians, particularly the old B&O main the Capitol Ltd. uses and the old PRR main used by the Pennsylvanian. The slow running over the mountains limits the potential for Baltimore/Washington - Pittsburgh corridor service and Philadelphia - Pittsburgh corridor service, and the old PRR route completely bypasses State College, PA, about the largest population concentration between Harrisburg and Pittsburgh and full of potentially train-riding students. Again, we don't need 160+ km/hr (100 mph) running, it just needs to be as fast or faster than driving.
So, $250,000 fines for each instance of delaying a passenger train would equalize that calculation pretty quickly. Seems advisable.A decade ago, a BNSF manager once told me that some of the higher revenue trains will pull in $250,000 revenue (not profit/net income, just sales revenue) per departure.
I did some digging a while back (and shame on me, I keep forgetting to bookmark the links where I find this info because I’d love to go back to it and get more information) that gave sample rates of freight train revenues. I want to say that the revenue is in the neighborhood of a couple hundred dollars per car-mile. Basically, they take in a ton of revenue. I seem to recall my calculations that if a long-distance Amtrak train were to match the revenue of a freight train on a per-mile basis, it would require several hundred passengers paying higher-bucket sleeper fares.
They money they get from Amtrak in track access charges is a drop in the bucket, in comparison. Even if delays (and associated penalties) brought their Amtrak income to zero, it still wouldn’t be more painful, financially, than having to reduce freight traffic to let Amtrak through on time. This, right here, is the crux of the issue for why freight railroads don’t like Amtrak. An Amtrak train can take up more than one freight train slot (because of higher speeds, plus, sometimes, the need to accommodate a train going the “wrong way” on a long, single-track railroad when the freights could otherwise fleet their trains), yet brings them very little revenue to do so. Amtrak OTP does okay when the railroad is not full, but when freight traffic picks up to the point where they need every possible slot, OTP goes down the toilet. And it doesn’t matter how “friendly” the railroad supposedly is, either.
Remember when the Empire Builder, running on “passenger-friendly” BNSF had the best OTP of any long-distance train (early to mid 2000s)? Then, suddenly, BNSF realized that their little-used freight line in northern North Dakota (so little used that they were ready to abandon a part of it through Devil’s Lake, and Amtrak was drafting up plans for a reroute) was useful for all of the oil fracking going on in North Dakota, and almost overnight, the Builder’s OTP dropped to nearly zero. It got to the point where Amtrak had to add an extra consist to the Seattle & Portland end because otherwise trains had no chance of departing the west coast on time.
Take a freight train pulling in $250,000 on a route half the length of the Empire Builder, and then try to see what a passenger train would have to earn in fares to even come close to that, and the math becomes very difficult to pencil out in favor of the passenger train in any scenario where both share the same tracks and you are facing potential traffic that is meeting or exceeding those capacity limits.
I've crayoned-out a route through State College -- basically requires a tunnel under State College proper (5-10 miles, probably cut and cover) and tunnels from there to Lewistown (5-10 miles to pass under Penn Roosevelt State Park), while the rest of it is easy. It would take much more work to straighten out the rest of the line (West of Altoona and the curves between Lewistown and Harrisburg) but I think the value of stopping at State College alone would be quite substantial. PA state government has not, so far, agreed. (*sigh*)2. That said, there are a few places where the existing rail routes are either so curvy and have such high grades or have out of the way routes that bypass current population centers that some new tracks would be in order. I'm thinking mostly of the routes that cross the central Appalachians, particularly the old B&O main the Capitol Ltd. uses and the old PRR main used by the Pennsylvanian. The slow running over the mountains limits the potential for Baltimore/Washington - Pittsburgh corridor service and Philadelphia - Pittsburgh corridor service, and the old PRR route completely bypasses State College, PA, about the largest population concentration between Harrisburg and Pittsburgh and full of potentially train-riding students. Again, we don't need 160+ km/hr (100 mph) running, it just needs to be as fast or faster than driving.
Construction technology has improved, but physics hasn't changed. 19th century technology is NOT why railroads follow rivers rather than go straight over mountains.
So, $250,000 fines for each instance of delaying a passenger train would equalize that calculation pretty quickly. Seems advisable.
Wonder what that would all cost? Might be cheaper to "move" Penn State to Altoona....I've crayoned-out a route through State College -- basically requires a tunnel under State College proper (5-10 miles, probably cut and cover) and tunnels from there to Lewistown (5-10 miles to pass under Penn Roosevelt State Park), while the rest of it is easy. It would take much more work to straighten out the rest of the line (West of Altoona and the curves between Lewistown and Harrisburg) but I think the value of stopping at State College alone would be quite substantial. PA state government has not, so far, agreed. (*sigh*)
I've lined up a similar route myself, but you also need to deal with Bald Eagle Mountain on the northwest side of State College, unless the new line is run down the Nittany Valley to the water gap that leads into Tyrone. It might be better to run the line directly from State College to Port Mathilda, because there is an existing rail line between Port Mathilda and Tyrone that could be upgraded. Also, the terrain in the Nittany valley is pretty rolling, so any rail line placed through it would require a lot of cuts and fills. So it might be better to have another tunnel, under Bald Eagle Mountain, and a ~400 ft. elevation difference between State College and Port Mathilda.I've crayoned-out a route through State College -- basically requires a tunnel under State College proper (5-10 miles, probably cut and cover) and tunnels from there to Lewistown (5-10 miles to pass under Penn Roosevelt State Park), while the rest of it is easy. It would take much more work to straighten out the rest of the line (West of Altoona and the curves between Lewistown and Harrisburg) but I think the value of stopping at State College alone would be quite substantial. PA state government has not, so far, agreed. (*sigh*)
Well, Elon Musk's Boring Company will provide the revolutionary technology needed to make this project much cheaper!Wonder what that would all cost? Might be cheaper to "move" Penn State to Altoona....
FYII've lined up a similar route myself, but you also need to deal with Bald Eagle Mountain on the northwest side of State College, unless the new line is run down the Nittany Valley to the water gap that leads into Tyrone. It might be better to run the line directly from State College to Port Mathilda, because there is an existing rail line between Port Mathilda and Tyrone that could be upgraded. Also, the terrain in the Nittany valley is pretty rolling, so any rail line placed through it would require a lot of cuts and fills. So it might be better to have another tunnel, under Bald Eagle Mountain, and a ~400 ft. elevation difference between State College and Port Mathilda.
Courts? No, Congress would have to do it. The courts would happily enforce it, but it would have to be passed by Congress first.Good luck getting that one through the courts.
Yes, that was my route. From west to east, Port Mathilda to State College, more or less following state route "Business 322" under State College. Then punch a base tunnel from Boalsburg (or maybe Tusseyville) to Woodland. One more tunnel and a few bridges gets you to Burnham, where the existing rail line from the east ends. Then you can run through from Harrisburg to Tyrone *via* State College. Huntingdon (and only Huntingdon) loses service.I've lined up a similar route myself, but you also need to deal with Bald Eagle Mountain on the northwest side of State College, unless the new line is run down the Nittany Valley to the water gap that leads into Tyrone. It might be better to run the line directly from State College to Port Mathilda,
Courts? No, Congress would have to do it. The courts would happily enforce it, but it would have to be passed by Congress first.
The US could follow India's example and shoot primarily for 100moph on all trunk routes, with 125 on select segments. This is entirely separate from the HSR side of things which is handled by an entirely different organization, with entirely different sources of funding so as not to interfere with the more widespread service provision goal for the trunk routes. But that sort of thing is unlikely to come to pass. We are too used to haphazard wasteful course of action involving trying everything that does not work before chancing onto something that does.Great comment. In a recent discussion, a point was made of how much bang for the buck you could get by making 30 mph track 50 mph, and 50 mph 79. Much easier than being obsessed about 110. We can do this. Reasonable speed, reliable, multiple frequency trains are the answer.
No, it wouldn't. Ever looked into Constitutional law? Crystal clear it's constitutional. Not debatable. Textbook regulation of interstate commerce.No, I mean the courts. Even if congress assessed such a penalty (doubtful), it would definitely face many challenges as to the constitutionality of such a penalty.
Just because a federal law passes the interstate commerce constitutional hurdle doesn't mean it wouldn't pass other hurdles.No, it wouldn't. Ever looked into Constitutional law? Crystal clear it's constitutional. Not debatable. Textbook regulation of interstate commerce.
A new HSR line shouldn't go straight through an established downtown of a city. In this case it would probably be most sensible to put the State College station somewhere south of downtown (PA26 / PA45 / Whitehall Rd. areas?) and encourage smart development around it. The university's campus transit could link up to it there.I've crayoned-out a route through State College -- basically requires a tunnel under State College proper (5-10 miles, probably cut and cover) and tunnels from there to Lewistown (5-10 miles to pass under Penn Roosevelt State Park), while the rest of it is easy.
Recently, a rail company in China announced that it is now offering high-speed rail cars with bogies that can adjust to train tracks of different gauges. If these trains work as advertised, then rail travel between Asia & Europe via rail is more convenient as changing bogies between border crossings takes up to 3 hours.