west point
Engineer
The additional dispatcher request is difficultto figure out. The number of grade crossing incidents probably much more than anyone thought. Co ordinating with Trirail at Iris Cp may be a problem as well. Dispatchers probably cannot set up changes from one carrier to other greater than 5 minutes.
Now after 'bright line and TriRail go to bred position should be combined. Ay one know the situation of the FLL draw bridge?
Now after 'bright line and TriRail go to bred position should be combined. Ay one know the situation of the FLL draw bridge?