Thus why I think the sensible solution is to have an agreement with the treatment plant and stake the thing shut.
If there is no waterborne traffic in that channel which is too shallow for any serious naval ships anyway, I don't think the Coast Guard will care too much. That is where the agreement with the only customer who creates barge traffic a few times a week comes in. There are numerous other "waterways" under Coast Guard jurisdiction along the NEC where the once openable bridges have been bolted permanently shut. There are others that are bolted shut so as to lay welded rails across them except that they are opened occasionally with 24 hour notice, when the welded rail is cut to open the bridge, and then the rails are welded back together after closing it, so as to allow 100+mph speed limit across the bridge. So no, it is not as open and shut case as is being suggested. Almost anything is possible.What do you think the Nimbys would do ?. They would raise a very loud stink over the stink transporting thru their neighborhood on non stop trucks. A very quick court case by the coast guard for impeding a navigable waterway would go against Amtrak.
Operationall? Or politically?How necessary will construction of the Bergen Loop actually be?
I am asking operationally and to meet ridership demands. Will the Bergen Loop really make a big difference for ridership, or can commuters from Bergen County rely on buses to the Port Authority or multi-level trains involving a transfer at Secaucus Junction?Operationall? Or politically?How necessary will construction of the Bergen Loop actually be?
Sent from my iPhone using Amtrak Forum
Very unlikely the 7 train (or any NYC Subway train), would ever leave the state. More likely solution would be to extend the PATH train from Hoboken to Secaucus...But then, NJT already does that...If some of us had our druthers they and many others would transfer to the #7 Subway Line at Secaucus.
In short stuffing everything including the proverbial kitchen sink into Penn Station is not a solution, it is the creation of additional problems. Nothing is being done to enhance Subway service for moving people from Penn Station to anywhere else while planning to add all sorts of additional trains into Penn Station. The results will be predictable as night follows day.
That is illustrating one of the tragedies of part of the rail advocacy community. Actually none of these constraints that they keep bringing up are written in stone, and any of them can be changed. But not if everyone seriously thinks they cannot be changed. The result will be that we will forever be prisoners of our own lack of resolve, imagination and commitment to making real progress.Very unlikely the 7 train (or any NYC Subway train), would ever leave the state. More likely solution would be to extend the PATH train from Hoboken to Secaucus...But then, NJT already does that...If some of us had our druthers they and many others would transfer to the #7 Subway Line at Secaucus.
In short stuffing everything including the proverbial kitchen sink into Penn Station is not a solution, it is the creation of additional problems. Nothing is being done to enhance Subway service for moving people from Penn Station to anywhere else while planning to add all sorts of additional trains into Penn Station. The results will be predictable as night follows day.
Fortunately there are irrational people around. Otherwise we would still be trying to figure out how to move from square to round wheelsIrrational exuberance, I know. We dont actually expect it to happen. But gosh it would be glorious.
As I said, irrational
It would have been much simpler to integrate commuter service thru New York back in the day when one company operated all of them...Penn Central, later, Conrail. And even LIRR was part of the former PRR until it was sold to the MTA.
While it may be more efficient for equipment utilization, it would be horrendous for passenger utilization. A couple of days ago, LIRR had multiple lines closed due to cars on the tracks. Overcrowding was so bad, the MTA restricted access to NYP. This is on top of the multiple days in the last week that LIRR had severe delays due to cars on the tracks.Imagine if New York had built a similar tunnel linking Penn Station with Grand Central...with a wye connection to the East River Tunnels, as well....
You could run trains from New Jersey not only to Long Island, but upstate as well...or from Long Island, upstate. running trains thru, would vastly improve the efficiency of the current Penn Station without the need to expand it. as much...
You could probably have even reduced the total number of tracks in such a case, allowing for wider platforms to handle detraining and entraining crowds...
While I agree with your point that run through trains can cause even larger cascading issues, I have to argue against this being any sort of "inefficiency" of such that would make something not worth doing. Cost allocations are political problems, not technical, and often it's better for the end user to have cost allocations dealt with on the agency end than for the end user to have to pay numerous disjointed fares to get from point A to point B. NYC, while maybe not the epitome of numerous non-coordinated (at least farewise) transit agencies, definitely has quite a bit of it (what reason is there, other than political, that PATH is completely separate from the NYC subway, at that neither of those have free transfers with LIRR, Metro North, or NJ Transit (nor are any of those cross-compatible, despite the NYC subway, LIRR, and Metro North all being part of the MTA.)Then, there is the whole cost allocation aspect. That's hardly efficient.
Good points....the LIRR West Side Yard does mitigate that situation somewhat, especially since the LIRR has a far greater number of trains than NJT does...in times of service disruption's, there remains the flexibility to 'turn' trains back if necessary...A more robust system is generally a more decoupled systems where fewer moving parts depend on other part working right. That is why in general endless run through operations with long legs on both sides tend to be very brittle system in the face of failures, that should be avoided. We learned that as we learned about building distributed systems of computers. But I have found it next to impossible to explain this issue to the rail enthusiasts. Most of them appear to have very little experience in building and operating distributed control systems and hence lack the background to appreciate the difficulties in the face of failures.
The balance of course has to be struck somewhere in the happy middle. That is what good engineering is all about.
I believe the day is coming when a new type of fare collection will make it possible for people to simply use their 'smart' phones or 'smart' credit/debit cards to travel seamlessly not only on all transit operator's in a metro area, but in any metro area as well...I heard that NYC will soon be replacing the 'swipe' Metrocard's with a new type of fare collection....While I agree with your point that run through trains can cause even larger cascading issues, I have to argue against this being any sort of "inefficiency" of such that would make something not worth doing. Cost allocations are political problems, not technical, and often it's better for the end user to have cost allocations dealt with on the agency end than for the end user to have to pay numerous disjointed fares to get from point A to point B. NYC, while maybe not the epitome of numerous non-coordinated (at least farewise) transit agencies, definitely has quite a bit of it (what reason is there, other than political, that PATH is completely separate from the NYC subway, at that neither of those have free transfers with LIRR, Metro North, or NJ Transit (nor are any of those cross-compatible, despite the NYC subway, LIRR, and Metro North all being part of the MTA.)Then, there is the whole cost allocation aspect. That's hardly efficient.
For the end customer, simplicity should be key, even if more accounting work has to be done on the back end. While there's a lot I can gripe about with our local transit system here in MSP, one thing that's amazing about it is that literally every transit agency that charges a fare is completely standardized not only on fare medium but passes, transfers, etc. I can go from commuter rail to light rail to city bus to suburban bus all on the same fare, with seamless transfers despite them being different modes and (at least for the suburban buses) different agencies. In my opinion, it should be like that everywhere.
I'll step off my soap box now.
This is an interesting observation Jis. When run through service was initially suggested I️ was thinking great idea. I was comparing this favorably with the RER lines in Paris when ch seemed to work pretty well.A more robust system is generally a more decoupled systems where fewer moving parts depend on other part working right. That is why in general endless run through operations with long legs on both sides tend to be very brittle system in the face of failures, that should be avoided. We learned that as we learned about building distributed systems of computers. But I have found it next to impossible to explain this issue to the rail enthusiasts. Most of them appear to have very little experience in building and operating distributed control systems and hence lack the background to appreciate the difficulties in the face of failures.
The balance of course has to be struck somewhere in the happy middle. That is what good engineering is all about.
SEPTA also does not run every train runthrough. They do so only for a subset of trains, and recently they have reduced the number to increase reliability.I think SEPTA runs with superior reliability to either MTA or NJT.