I have never understood why all overhead is not converted to constant tension as quickly as possible, nor why the extreme costs to do so are consistently proclaimed. That use of constant tension is the far better way is a no-brainer, and should not be excessively expensive, as your fixed points that have to carry the horizontal forces in fixed catenary would instead of carrying a force that would vary considerably with temperature are now carrying a constant load with the thermal expansion and contraction in the wire being absorbed by weights going up and down along the pole. Anyone that can tell me what I am missing, have at it.