Seaboard92
Engineer
The problem with that is that, based on prior experience, keeping the train to schedule would be difficult, and if the northbound is also the Night Owl, then it's possible that the "Night Owl" might become a day train most of the time and thus lose its utility.
Actually I wouldn't be too worried about an Atlanta north train and scheduling issues. For the most part NS is pretty fluid Atlanta to the north. Especially once you get to Charlotte it becomes really fluid after that point. The problem on the Crescent is Atlanta south.